Analysis of the effect of assembly errors on deviations from design arch sizes
About authors
- 1 — Ph.D., Dr.Sci. professor Petersburg State Transport University
- 2 — Ph.D. associate professor Petersburg State Transport University
Abstract
Arched bridges with suspension brackets of cables are built over the river Ohta in Saint Petersburg and the river Ishim in Astana (Kazakhstan). Each semi-arch was carried out of separate units from supporting block of the arch tightening. There are given the formulas for calculating the precision of semi-arch jointing depending on the fabrication accuracy and dimensions of its elements, on the shape and size of the arch span. Calculation examples are given for the arch bridge construction over the river Ishim in Astana.
Область исследования:
(Archived) Engineering geodesy
Funding:
None
Similar articles
Analysis of dissemination of surface deformation at open pit mining
2013 V. V. Budilova, A. A. Pavlovich, D. A. Ikonnikov
Automation of architecture and urban-planning authority as the basis of strategic planning
2013 P. P. Spirin, E. B. Bejaeva, V. F. Kovyazin, E. D. Asetskaya
Influence condition of ground on complexity in the process open pit Kuzbas`s coal deposits
2013 R. A. Takranov, A. A. Litvinova
Assessment of the degree of disturbance of the undermined strata by technogenic water conducting fractures according to geomechanical monitoring in the excavations of Yakovlevski mine
2013 V. N. Gusev, D. A. Ilukhin, A. E. Zhuravlev