Article

The distribution of stresses in the inter-chamber pillars

Authors:
V. D. Slesarev
Date submitted:
1940-07-03
Date accepted:
1940-09-17
Date published:
1941-05-26

Abstract

To correctly resolve the issue of the nature of the stressed state of the pillar and the deformations it experiences, it is necessary to have a correct understanding of the method of applying load to the pillar, since the latter determines the nature of the deformation – plastic or, conversely, elastic‑brittle. In addition, it should be borne in mind that the very entry into operation of new chambers, which determines the increase in the load on the pillar, does not occur immediately, but rather slowly and without jumps, but gradually. Having reached its maximum value – the full weight of the overlying rock strata – the load is not removed from the pillar, but continues to act for an indefinitely long time, which forces us to take into account the influence of time when considering the deformations of the pillar. Thus, it should be recognized that all conditions for loading interchamber pillars and the work of the load itself meet the conditions for the manifestation of plastic deformations.

Область исследования:
Mining
Funding:

None

Go to volume 14

Similar articles

Determination of elastic deformations in the rope when lowering a load
1941 N. P. Neronov
Evaluation of the error of analogy and the error of contouring in the calculation of mineral reserves
1941 D. A. Kazakovskii
The calculation of starting resistances and configurations of the acceleration relay
1941 F. N. Shklyarskii
Determining the depression of the natural airflow using a calculation method.
1941 D. F. Borisov
The fundamental issues of planning the coal industry in the USSR
1941 I. A. Nedoluzhenko
How mechanization of underground coal transport has developed abroad
1941 V. I. Gerontyev