Submit an Article
Become a reviewer
Vol 49 Iss. 1
Pages:
21-27
Download volume:
RUS
Article

On the influence of the degree of loosening on ore release under caving rocks

Authors:
N. Z. Galaev
M. I. Shiman
Date submitted:
1963-07-18
Date accepted:
1963-09-22
Date published:
1964-10-31

Abstract

It is known that mass blasting of ore by boreholes or mine charges under the system of forced level caving can be carried out on pre‑formed compensation chambers or without them. The latter method – single‑stage ore breaking in a confined environment – is currently used at the S. M. Kirov apatite mine, at the Zapolyarny mine of the Norilsk Combine, at the Salair mine, at the mine named after the XXII Congress of the CPSU of the Zyryanovsky Combine, and others. The breaking method affects the physical and mechanical properties of the broken ore: if in variants with compensation chambers the coefficient of initial loosening of the ore immediately after blasting the block varies from 1.3 to 1.6, then with single‑stage breaking this coefficient ranges from 1.1 to 1.3.

Область исследования:
Mining
Funding:

None

Go to volume 49

References

  1. Baron L. I., Fugzan M. D. Investigation of ore release at the system of floor forced caving with field excavation. Izdatel'stvo AN SSSR, 1959.
  2. Osaulenko P. L., Rosinoer B. L., Permyakov R. S. Ore stripping by deep boreholes without compensation space. Gornyi zhurnal, 1960, No. 8.
  3. Sadovskiy G. I., Pakhomov A. S. Block forced caving with continuous aimless ore excavation (Zapolyarny mine of Norilsk Combine). Zapiski Gornogo Instituta, vol. XLIV, iss. 1, 1961.
  4. Shebelnikov G. P., Lisovsky G. L. et al. One-Stage System of Floor Caving with Ore Stripping by Inclined Wells. Gornyy zhurnal, 1960, No. 6.
  5. Pustovalov A. I. Wider introduction of single-stage excavation. Gornyi zhurnal, 1964, No. 2.

Similar articles

Industrial studies of mining systems at the Zapolyarny Mine of the Norilsk Combine
1964 A. I. Shablygin
Mining pressure management at the Zapolyarny mine of the Norilsk Combine
1964 N. Z. Galaev, A. V. Isaev
Problems of effective development of complex vein forms
1964 A. I. Shablygin, V. G. Eliseev, E. I. Boguslavskii
Calculation of concrete support walls for strength and stability
1964 V. N. Semevskii, Yu. I. Panenkov, M. P. Markovich
Basic dependencies in the development of the working face at open pits, prone to landslides
1964 N. D. Zolotarev
On optimum parameters of hydraulic mining at placer deposits
1964 G. M. Lezgintsev