Industrial studies of productive development systems at the Polar Mine of Norilsk Combine

Authors:
A. I. Shablygin
Date submitted:
1963-07-23
Date accepted:
1963-09-08
Date published:
1964-10-31

Abstract

At the Zapolyarny mine of the Norilsk Combine, the complex conditions of the disseminated ore deposit make it difficult to develop mining systems and select their individual design elements. The lack of similar examples in the global mining practice forced to search for new ways of solving mining engineering issues, to check and correct the decisions made. Rapid growth rates of ore production led to the fact that the experimental application of new variants of systems and methods of mining pressure control went simultaneously with operational works. Sometimes this helped to solve problems as quickly as possible, and at other times, on the contrary, it made it difficult to reach the right conclusions.

Область исследования:
Mining
Go to volume 49

References

  1. Shablygin A. I. Increase of technological discipline at mining enterprises. Bulletin of Nonferrous Metallurgy, 1960, No. 14.
  2. Zhmurko P. T., Pakhomov A. S., Isaev A. V., Shablygin A. I., Galaev N. Z. On rational parameters of the system of forced block caving at Zapolyarny mine. Non-Ferrous Metallurgy, 1963, No. 3.

Similar articles

Use of volume growth charts in the design and planning of mining operations at open-pit mines
1964 N. D. Semenov, I. M. Norkin, V. D. Smelov
About optimum parameters of hydraulic works at placer deposits
1964 G. M. Lezgintsev
Mode of ore release from uprising branched stores
1964 E. I. Boguslavskii
Model study of strength and stability of inter-chamber concrete piers
1964 Yu. I. Panenkov
On the influence of the degree of loosening on ore release under caving rocks
1964 N. Z. Galaev, M. I. Shiman
Method of estimation of rock fracturing
1964 V. A. Padukov