Submit an Article
Become a reviewer
Vol 58 Iss. 1
Pages:
157-163
Download volume:
RUS
Article

Rational application area of vibratory ore discharge at Apatit Combine

Authors:
Yu. A. Korotkov
Date submitted:
1968-07-24
Date accepted:
1968-09-15
Date published:
1969-05-05

Abstract

At the mines of Apatit Combine the labor productivity of workers engaged in ore output has increased due to the improvement of scraper delivery parameters; reduction of the maximum scraping length to 25-30 m, preparation of the block bottom with slick-less ore loading and application of scraper winches with a capacity of 75-100 KWt, as well as changing the ore condition for blocks with scraper delivery from 400 to 700 mm. This reduced oversize output and thereby increased net scraping time. The productivity of scraper delivery reached 300-350 tons/shift.

Область исследования:
(Archived) Without section
Go to volume 58

References

  1. Busyrev V. M., Gushchin V. V. Efficiency of development of apatite-nepheline ores by the system of level forced caving. Nauka, 1964.
  2. Berntsev E. K. Reserves for increasing the productivity of scraper delivery and its performance depending on its determining parameters when using type equipment. Proc. Gipronickel, iss. 28, 1965.
  3. Korotkov Yu. A., Berntsev E. K. Quality of ore crushing and its influence on productivity and cost price of vibratory delivery. Proc. Gipronickel, iss. 31, 1966.

Similar articles

Mining excavations by pre-slotting method
1969 V. V. Sychev
Investigation of properties of injection solutions for reinforcing the embedment of cleaning chambers
1969 Yu. L. Minaev
Peculiarities of influence of weak layers and ice on the stability of pillars
1969 V. G. Bezkaravayny, Yu. V. Shuvalov
Investigation of the stressed state of pillars under the chamber-pillar system of development at the Mayak mine
1969 V. D. Paliy, Yu. D. Orlov, V. P. Ushenin
Influence of concrete supports on bearing capacity of ore pillars under chamber mining systems
1969 V. P. Ushenin
Investigation of bearing pressure at different order of block excavation in a floor (for conditions of mining of lower horizons of Kirovsky mine of Apatit Combine)
1969 N. Z. Galaev, G. G. Milekhin