Submit an Article
Become a reviewer
Vol 58 Iss. 1
Pages:
150-156
Download volume:
RUS
Article

Investigation of the influence of ore size on its flowing out

Authors:
L. F. Belichenko
Date submitted:
1968-07-10
Date accepted:
1968-09-01
Date published:
1969-05-05

Abstract

The existing methods of breaking in mass caving systems are usually characterized by a significant yield of large lump ore (over 250‑350 mm). This is well illustrated by the example of the Apatit mines. Table 1 shows the yield of lumps of various sizes depending on the method of breaking. ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

Similar articles

On directions of development of technology of underground development of ore deposits
1969 V. N. Semevsky
On the depth of mining ore deposits by systems with open stopes
1969 A. B. Makeenkov
Physical and mechanical properties of solidifying fill in artificial pillars
1969 T. N. Smirnova
Influence of ore massif fracturing on ore breaking stripping by deep boreholes at the mines of the Pechenganickel Combine
1969 E. G. Lezgintsev
Estimation of mutual influence of close cylindrical chambers
1969 V. S. Romanov
Influence of concrete supports on bearing capacity of ore pillars under chamber mining systems
1969 V. P. Ushenin