Rational application area of vibratory ore discharge at Apatit Combine

Authors:
Yu. A. Korotkov
Date submitted:
1968-07-24
Date accepted:
1968-09-15
Date published:
1969-05-05

Abstract

At the mines of Apatit Combine the labor productivity of workers engaged in ore output has increased due to the improvement of scraper delivery parameters; reduction of the maximum scraping length to 25-30 m, preparation of the block bottom with slick-less ore loading and application of scraper winches with a capacity of 75-100 KWt, as well as changing the ore condition for blocks with scraper delivery from 400 to 700 mm. This reduced oversize output and thereby increased net scraping time. The productivity of scraper delivery reached 300-350 tons/shift.

Область исследования:
(Archived) Without section
Go to volume 58

References

  1. Busyrev V. M., Gushchin V. V. Efficiency of development of apatite-nepheline ores by the system of level forced caving. Nauka, 1964.
  2. Berntsev E. K. Reserves for increasing the productivity of scraper delivery and its performance depending on its determining parameters when using type equipment. Proc. Gipronickel, iss. 28, 1965.
  3. Korotkov Yu. A., Berntsev E. K. Quality of ore crushing and its influence on productivity and cost price of vibratory delivery. Proc. Gipronickel, iss. 31, 1966.

Similar articles

Excavation of barrier pillars during mining of ore fields by caving systems
1969 N. Z. Galaev
Peculiarities of influence of weak layers and ice on the stability of pillars
1969 V. G. Bezkaravayny, Yu. V. Shuvalov
Depth of ore deposits development by open-cutting systems
1969 A. B. Makeenkov
Ways to improve methods of mining valuable ore pillars
1969 Yu. I. Panenkov, V. F. Pryalukhin, Yu. L. Minaev, A. V. Karpunin, A. G. Vasiliev
Mining excavations by pre-slotting method
1969 V. V. Sychev
Investigation of the influence of ore size on its flowing out
1969 L. F. Belichenko