Rational application area of vibratory ore discharge at Apatit Combine

Authors:
Yu. A. Korotkov
Date submitted:
1968-07-24
Date accepted:
1968-09-15
Date published:
1969-05-05

Abstract

At the mines of the Apatit Combine, the labour productivity of workers engaged in ore drawing has increased due to the improvement of scraper delivery parameters: reduction of the maximum scraping length to 25‑30 m, preparation of the block bottom with manless ore loading and application of scraper winches with a capacity of 75‑100 kW, as well as changing the ore size limit for blocks with scraper delivery from 400 to 700 mm. This reduced oversize output and thereby increased net scraping time. The productivity of scraper delivery reached 300‑350 t/shift.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

References

  1. Busyrev V. M., Gushchin V. V. Efficiency of development of apatite-nepheline ores by the system of level forced caving. Nauka, 1964.
  2. Berntsev E. K. Reserves for increasing the productivity of scraper delivery and its performance depending on its determining parameters when using type equipment. Tr. Gipronickelya, iss. 28, 1965.
  3. Korotkov Yu. A., Berntsev E. K. Quality of ore crushing and its influence on productivity and cost price of vibratory delivery. Tr. Gipronickelya, iss. 31, 1966.

Similar articles

On the depth of mining ore deposits by systems with open stopes
1969 A. B. Makeenkov
On directions of development of technology of underground development of ore deposits
1969 V. N. Semevsky
Possible causes of rock shoots in loose unsupported workings on the example of Khibiny apatite deposits
1969 V. I. Krapivin, A. G. Protosenya
Prof. Vladimir N. Semevsky (1898-1968)
1969 A. I. Shablygin, N. Z. Galaev, Yu. I. Panenkov
To On the question of underground thermal insulation of horizons insulation at the mines of the Apatit Combine
1969 O. N. Rusak, Yu. N. Nikolaev
Investigation of the stressed state of pillars under the chamber-pillar system of development at the Mayak mine
1969 V. D. Paliy, Yu. D. Orlov, V. P. Ushenin