Rational application area of vibratory ore discharge at Apatit Combine

Authors:
Yu. A. Korotkov
Date submitted:
1968-07-24
Date accepted:
1968-09-15
Date published:
1969-05-05

Abstract

At the mines of Apatit Combine the labor productivity of workers engaged in ore output has increased due to the improvement of scraper delivery parameters; reduction of the maximum scraping length to 25-30 m, preparation of the block bottom with slick-less ore loading and application of scraper winches with a capacity of 75-100 KWt, as well as changing the ore condition for blocks with scraper delivery from 400 to 700 mm. This reduced oversize output and thereby increased net scraping time. The productivity of scraper delivery reached 300-350 tons/shift.

Область исследования:
(Archived) Without section
Go to volume 58

References

  1. Busyrev V. M., Gushchin V. V. Efficiency of development of apatite-nepheline ores by the system of level forced caving. Nauka, 1964.
  2. Berntsev E. K. Reserves for increasing the productivity of scraper delivery and its performance depending on its determining parameters when using type equipment. Proc. Gipronickel, iss. 28, 1965.
  3. Korotkov Yu. A., Berntsev E. K. Quality of ore crushing and its influence on productivity and cost price of vibratory delivery. Proc. Gipronickel, iss. 31, 1966.

Similar articles

Depth of ore deposits development by open-cutting systems
1969 A. B. Makeenkov
Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill
1969 Yu. L. Minaev, A. V. Karpunin, A. G. Vasiliev
Computer-aided selection of optimal parameters of blocks in caving development
1969 A. A. Kavtaskin
Mining excavations by pre-slotting method
1969 V. V. Sychev
Calculation of limit spans of unshored frozen roofs
1969 Yu. V. Shuvalov
Physical and mechanical properties of solidifying fill in artificial pillars
1969 T. N. Smirnova