Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill
Abstract
In 1966 at the Kaula-Kotselvaara mine of the Pechanganickel Combine, experimental work was carried out on the development of an inter-chamber pillar located between the walls of the cement-reinforced backfill. Pilot works were carried out in a 6-8 m thick section of the ore body with a dip angle of 26-30°. The intervening rocks - phyllites - are partially broken by transverse fractures. In general, the ore and rock are stable. Ore strength coefficient is 8-12, rock strength coefficient is 10-12. Volume weight of the ore is 3.2 t/m3 and of the embedding material is 2.8 t/m3.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
On directions of development of technology of underground development of ore deposits
1969 V. N. Semevsky
Influence of ore massif fracturing on ore stripping by deep boreholes at the mines of Pechenganickel Combine
1969 E. G. Lezgintsev
Peculiarities of influence of weak layers and ice on the stability of pillars
1969 V. G. Bezkaravayny, Yu. V. Shuvalov