Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill

Authors:
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-28
Date accepted:
1968-09-07
Date published:
1969-05-05

Abstract

In 1966 at the Kaula-Kotselvaara mine of the Pechanganickel Combine, experimental work was carried out on the development of an inter-chamber pillar located between the walls of the cement-reinforced backfill. Pilot works were carried out in a 6-8 m thick section of the ore body with a dip angle of 26-30°. The intervening rocks - phyllites - are partially broken by transverse fractures. In general, the ore and rock are stable. Ore strength coefficient is 8-12, rock strength coefficient is 10-12. Volume weight of the ore is 3.2 t/m3 and of the embedding material is 2.8 t/m3.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

Similar articles

On directions of development of technology of underground development of ore deposits
1969 V. N. Semevsky
Influence of ore massif fracturing on ore stripping by deep boreholes at the mines of Pechenganickel Combine
1969 E. G. Lezgintsev
Calculation of limit spans of unshored frozen roofs
1969 Yu. V. Shuvalov
Peculiarities of influence of weak layers and ice on the stability of pillars
1969 V. G. Bezkaravayny, Yu. V. Shuvalov
Economic assessment of damage from losses and dilution during development of rich ores
1969 P. G. Makulov
Physical and mechanical properties of solidifying fill in artificial pillars
1969 T. N. Smirnova