Submit an Article
Become a reviewer
Vol 58 Iss. 1
Pages:
145-149
Download volume:
RUS
Article

Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill

Authors:
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-28
Date accepted:
1968-09-07
Date published:
1969-05-05

Abstract

In 1966 at the Kaula‑Kotselvaara mine of the Pechenganikel Combine, experimental work was carried out on the development of an inter‑chamber pillar located between the walls of cement‑reinforced backfill. Pilot works were carried out in a 6‑8 m thick section of the ore body with a dip angle of 26‑30°. The host rocks – phyllites – are partially broken by transverse fractures. In general, the ore and rock are stable. The strength coefficient of the ore is 8‑12, of the rock – 10‑12. Bulk density of the ore is 3.2 t/m³, of the backfill material – 2.8 t/m³.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

Similar articles

Investigation of properties of injection solutions for reinforcing the backfill of stopes.
1969 Yu. L. Minaev
Influence of heap pillar wall reinforcement on heap pillar strength
1969 Yu. A. Modestov
Excavation of barrier pillars during mining of ore fields by caving systems
1969 N. Z. Galaev
Influence of ore massif fracturing on ore breaking stripping by deep boreholes at the mines of the Pechenganickel Combine
1969 E. G. Lezgintsev
Influence of concrete supports on bearing capacity of ore pillars under chamber mining systems
1969 V. P. Ushenin
Calculation of limit spans of unshored frozen roofs
1969 Yu. V. Shuvalov