Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
89-94
Download volume:
RUS
Article

Blasted rock mass stockpile management at a quarry

Authors:
K. I. Kataya
N. P. Ershov
A. F. Bogachev
V. V. Plekhov
Date submitted:
1971-07-26
Date accepted:
1971-09-22
Date published:
1972-07-07

Abstract

Analysis of the Kovdorskiy open pit operation over the last 5 years has shown that the volume of the blasted block varied widely (from 30 to 130 thousand m3), with its average value for rock decreasing by 22.4 thousand m3 (from 55.6 to 33.2 thousand m3) and for ore by 28 thousand m3 (from 51.5 to 23.5 thousand m3). Transient reserves of blasted rock mass also fluctuated significantly; its maximum reserve in 1967-1968 reached 780-800 thousand m3, and in 1969 amounted to 840 thousand m3, while the minimum reserve in 1965 was equal to 270 thousand m3, and in 1967 and 1968 amounted to 520 and 500 thousand m3, respectively.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Estimation of the uniformity of mining transportation equipment operation in the quarries of the Polar Region
1972 A. V. Zhukov
Interrelations of velocities in mining development (volumetric problem)
1972 G. P. Konstantinov
Criteria for assessing the optimality of the direction of mining operations in a quarry
1972 A. I. Arsentiev
Determination of ore pit productivity reserve
1972 O. V. Shpansky
Influence of landslides on the productivity of mining transportation equipment
1972 S. G. Khristov
Determination of open pit boundaries by the method of using the acceptable average stripping ratio
1972 O. V. Shpansky, A. A. Kovpak