Submit an Article
Become a reviewer
N. P. Ershov
N. P. Ershov

Co-authors

Articles

Article
  • Date submitted
    1971-07-26
  • Date accepted
    1971-09-22

Blasted rock mass stockpile management at a quarry

Article preview

Analysis of the Kovdorsky open pit operation over the last 5 years has shown that the volume of the blasted block varied widely (from 30 to 130 thousand m³), with its average value for rock decreasing by 22.4 thousand m³ (from 55.6 to 33.2 thousand m³) and for ore by 28 thousand m³ (from 51.5 to 23.5 thousand m³). Carry over reserves of blasted rock mass also fluctuated significantly; its maximum reserve in 1967 1968 reached 780 800 thousand m³, and in 1969 amounted to 840 thousand m³, while the minimum reserve in 1965 was 270 thousand m³, and in 1967 and 1968 it was 520 and 500 thousand m³, respectively.

How to cite: Kataya K.I., Ershov N.P., Bogachev A.F., Plekhov V.V. Blasted rock mass stockpile management at a quarry // Journal of Mining Institute. 1972. Vol. 63. Iss. 1. p. 89-94.