Criteria for assessing the optimality of the direction of mining operations in a open pit
Authors:
Abstract
One of the most important decisions in the design of open pits is the choice of direction and intensity of movement of mining operations in the horizontal direction and in depth. These issues are usually solved when establishing the method of opening the open pit field and the calendar plan of mining operations. Implemented opening at the deposit for a long time, and sometimes forever, predetermines the order and efficiency of the open pit.
Область исследования:
(Archived) Without section
Funding:
None
References
- Arsentiev A. I. Determination of productivity and boundaries of quarries. 2nd ed. Nedra, 1970. (in Russian)
- Astakhov A. S. Economic Efficiency of Capital Investments in the Coal Industry. Nauka, 1964. (in Russian)
- Khokhryakov V. S. Indicators of technical progress in the USSR quarries. Izv. vuzov, Gornyi zhurnal, 1965, No. 10. (in Russian)
Similar articles
Classification of stripping methods and systems of development of open pit fields
1972 A. I. Arsentiev
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov