Abstract

At the Mukulansky open pit of Tyrnyauz Mining and Metallurgical Combine bulldozers are often forced to work in dangerous areas above the excavated space and on unstable areas of rock from the shafts during their leveling. Very dangerous is the presence of people and machines on the so-called collapse prism - a part of the shaft surface, which even with a slight additional load can lose its grip on the main mass of rock of the moldboard and under the action of its own weight collapse downwards together with the bulldozer and people ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 77

Similar articles

Influence of the schemes of the executive body drive of the mechanohydraulic harvester on its theoretical productivity
1978 B. S. Makhovikov
Using the predictive signal for solving the problem of optimal control of the drying drum
1978 V. G. Deitch, V. V. Stalsky
Statistical characteristics of the Vorkuta region atmospheric air temperature fluctuations as the main perturbation of the system of automatic control of thermal objects of mines
1978 N. M. Tretyakov, N. M. Tretyakova, A. S. Stepanov
Primary converters of thermovacuum moisture meters
1978 A. G. Volchenko, R. M. Proskuryakov
Own and mutual capacitance of “point” electrodes in the presence of dielectric layer
1978 E. S. Krichevsky, V. G. Deitch, V. P. Terekhov
Frequency mixers for high-frequency capacitance meters made on the scheme of F-meter
1978 E. A. Kalm