Experience of industrial operation of CPC in 6 kV distribution networks of potash mines

Authors:
O. V. Ivanov
B. P. Konovalov
M. M. Malyushitsky
V. D. Ryzhkov
Date submitted:
1978-08-23
Date accepted:
1978-10-09
Date published:
1979-02-01

Abstract

The low quality of voltage in the centers of supply of loads of mining sites during normal operation of the distribution network required regime measures to improve it ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 84

Similar articles

Formation on a physical model of loads statistically equivalent to real ones
1979 B. P. Konovalov
Methodology of calculation of modes of CPC with thyristor arrester at short circuits in distribution networks 6 kV
1979 O. V. Ivanov, S. A. Maksimov, E. M. Proskuryakov
Control units of thyristor frequency converter in vector control system
1979 V. V. Alekseev, V. A. Dartau, Yu. P. Pavlov, V. V. Rudakov
Calculation methodology of distribution networks of mining enterprises with compensating devices for voltage and reactive power losses
1979 O. V. Ivanov, E. M. Proskuryakov, L. N. Smirnova
Complete protection of transformer substations of quarries against phase-to-ground faults
1979 V. P. Gansky, N. K. Smirnov
Approximate method of calculation of operating modes with nonlinear inductive shunt element
1979 V. G. Bauman, V. M. Kvyatkovsky, S. A. Maksimov