Experience of industrial operation of CPC in 6 kV distribution networks of potash mines
Abstract
The low quality of voltage in the centers of supply of loads of mining sites during normal operation of the distribution network required regime measures to improve it ...
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Methodology of calculation of modes of CPC with thyristor arrester at short circuits in distribution networks 6 kV
1979 O. V. Ivanov, S. A. Maksimov, E. M. Proskuryakov
Control by the principle of subordinate regulation of electric drive with double-fed asynchronous machine
1979 V. A. Dartau
Application of analytical self-tuning circuits in electric drives with sequential correction
1979 A. S. Soloviev, N. A. Ambartsumyan