Methodology of calculation of modes of CPC with thyristor arrester at short circuits in distribution networks 6 kV

Authors:
O. V. Ivanov
S. A. Maksimov
E. M. Proskuryakov
Date submitted:
1978-08-21
Date accepted:
1978-10-29
Date published:
1979-02-01

Abstract

Protection of longitudinal compensation units of CPC from overvoltages at short-circuits in the network of 6 kV can be implemented by means of thyristor arrester, included in parallel to capacitors of CPC ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 84

Similar articles

Comparison of mine contact electric locomotives auto-driving systems
1979 E. V. Bannikov, V. P. Stepanenko, L. A. Chubarov
Calculation methodology of distribution networks of mining enterprises with compensating devices for voltage and reactive power losses
1979 O. V. Ivanov, E. M. Proskuryakov, L. N. Smirnova
Complete protection of transformer substations of quarries against phase-to-ground faults
1979 V. P. Gansky, N. K. Smirnov
Influence of inductance of thyristor arrester power circuit on short-circuit CPC modes
1979 S. A. Maksimov
Control units of thyristor frequency converter in vector control system
1979 V. V. Alekseev, V. A. Dartau, Yu. P. Pavlov, V. V. Rudakov
Criteria of mine electric locomotive control during train moving from a place
1979 V. N. Kordakov