Geotechnology for development of solid mining fields
  • Date submitted
    2011-11-30
  • Date accepted
    2012-01-23
  • Date published
    2012-05-01

Building of underground construction protected enclosing wall and method of displacement forecast of the soil

Article preview

The volumetric model taking and performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall. Set out conditions for the construction of the  pit and the main technological  solutions.

How to cite: Popov M.G., Stepanenko S.V. Building of underground construction protected enclosing wall and method of displacement forecast of the soil // Journal of Mining Institute. 2012. Vol. 199. p. 55.
Geotechnology for development of solid mining fields
  • Date submitted
    2011-11-15
  • Date accepted
    2012-01-29
  • Date published
    2012-05-01

Numerical modeling of deep excavation structures behavior during construction

Article preview

Numerical modeling of deep excavation construction is done in plane strain condition. The influence of boundary condition, contact condition between soil and structures, constrain of cantilever wall, thickness of the wall and anchors on the strain condition of the soil is found.

How to cite: Protosenya A.G., Potemkin D.A., Stepanenko S.V. Numerical modeling of deep excavation structures behavior during construction // Journal of Mining Institute. 2012. Vol. 199. p. 180.
Geotechnology for development of solid mining fields
  • Date submitted
    2011-11-27
  • Date accepted
    2012-01-14
  • Date published
    2012-05-01

Building of construction pit and investigation of displacement wall of the secant pile

Article preview

Performed mathematical modeling the process of construction of the pit under the enclosing wall of secant piles. The results of mathematical modeling on the horizontal displacements of the pit wall.