Date submitted2017-08-25
-
Date accepted2017-11-17
-
Date published2018-02-22
Improved estimation of open pit excavator capacity
- Authors:
- S. N. Zharikov
The paper addresses issues related to estimation of operational time for open pit excavators during truck loading operations. The author analyzes the method of annual capacity estimation and highlights disagreements in different ways of operational time logging. Recommendations are offered concerning estimation of excavator capacity taking into account its repair cycle. The paper contains an analysis of the cyclical nature of various types of maintenance in the interval between capital repairs as a function of operational time. Guidelines are proposed that allow to calculate annual production days of the excavator with regards to the repair cycle and adjusted utilization coefficient throughout the shift. It has been established that decreasing the coefficient of excavator utilization throughout the shift and more precise logging of annual work days lead to a slower decrease in estimated machine capacity than the one described in the reference literature. According to the suggested method, estimated excavator capacity is more than 23 % higher than the value stated in the reference literature.
-
Date submitted2009-10-07
-
Date accepted2009-12-22
-
Date published2010-09-22
Providing of safe conditions for mining of shaftbottom protective pillars in deep ore mines at Тalnakh
- Authors:
- V. A. Zvezdkin
- A. G. Anokhin
- R. B. Galaov
Consideration is given to the causes complicating the mining of shaftbottom pillar and protection of shaft lining. The analysis is given to the formation of stress-strain state of the protective pillar and its enclosing rocks. Practical recommendations are given for control of deformation and stresses in the shaftbottom mass during extraction of protective pillars in deep ore mines at Talnakh.
-
Date submitted2009-08-26
-
Date accepted2009-10-25
-
Date published2010-02-01
The improvement of selective extraction of thick potash seams mined with room and pillar mining method
- Authors:
- Yu. G. Sirenko
- M. Yu. Brychkov
- E. R. Kovalsky
Technological scheme of selective extraction of a complex thick potash seam on the basis of cutting machine «Bucyrus Model 25 M0» is proposed. Stable pillars’ width and room dimensions are calculated. Economical effect is also presented.
-
Date submitted2009-08-22
-
Date accepted2009-10-19
-
Date published2010-02-01
The substantiation of reinforcing support of preparation mines in the ore massive of the Yakovlevskiy deposit
- Authors:
- Yu. N. Antonov
- V. Yu. Sinegubov
The paper justifies a design of reinforcing mine support of the protective roof at the priority high-grade ore mining site of the Yakovlevskiy deposit. Experience of mine roadway support with the KMP-A3 standing support has been analyzed. A reinforcing support is offered consisting of rock bolts back bracing the ore exposure, which best fits with continuous miner roadheading and consolidating stowing (concrete).