Submit an Article
Become a reviewer

Search articles for by keywords:
арендная ставка

Geoeconomics and Management
  • Date submitted
    2021-03-13
  • Date accepted
    2021-05-21
  • Date published
    2021-09-20

Cadastral valuation of forest lands, taking into account the degree of development of their infrastructure

Article preview

The article substantiates the need to improve methodology for cadastral valuation of forest lands and change the principles for calculating the rental rate of forest lands, on the basis of which the rent for the use of these lands will be determined in future. The methodology for determining the cadastral value of forest lands, taking into account the degree of development of their infrastructure, is presented. The infrastructure of lands of the forest fund is considered and an algorithm for assessing such infrastructure by means of geoinformation modeling is shown. A method for calculating a complex integral indicator (coefficient of infrastructure development) is presented, which is applicable to differentiate lands covered and not covered with tree vegetation, for their effective and rational management. The complex integral indicator determines the availability of forest plots, as it takes into account location of the forest fund infrastructure in relation to assessment plots, which makes it possible to obtain information about the time spent on covering the required distance. This methodology can be applied to assess the quality and condition of the existing infrastructure of the forestry sector in implementation of measures within the framework of the Strategy for the development of the forestry complex, providing for support and construction of infrastructure facilities on the forest fund lands. The method was tested in the Baltiysky district forestry of the Baltiysko-Belozersky taiga region. The results were as follows: the map of the forest fund infrastructure development within the boundaries of differentiation assessment according to the calculated integral indicator of infrastructure development was obtained; the regression model for calculating the rent rate taking into account the taxation value and integral indicator infrastructure development was received: the cadastral value of forest lands taking into account the developed model was calculated.

How to cite: Kovyazin V.F., Kitcenko A.A., Shobairi S.O.R. Cadastral valuation of forest lands, taking into account the degree of development of their infrastructure // Journal of Mining Institute. 2021. Vol. 249 . p. 449-462. DOI: 10.31897/PMI.2021.3.14
Electromechanics and mechanical engineering
  • Date submitted
    2020-10-05
  • Date accepted
    2021-03-30
  • Date published
    2021-06-24

Improving the efficiency of relay protection at a mining and processing plant

Article preview

The paper presents the results of constructing effective relay protection in the power supply system of a mining and processing plant (MPP). A brief description of the MPP is given, the power supply and substitution circuits used to calculate the short-circuit currents are given. A statistical analysis of failures in the electric network of the MPP has been carried out, which makes it possible to draw conclusions about the nature of failures ranges. Analysis of the registered faults shows that a significant part of them are line-to-earth faults, which in most cases turn into multiphase short circuits, which are interrupted by overcurrent protection. In order to improve the efficiency and reliability of the relay protection, the power supply scheme of the MPP was refined and analyzed. The calculation of the short-circuit currents was made, which made it possible to calculate the settings of the relay protection and give recommendations on the place of its installation and adjustment in order to ensure the normal operation of electricity consumers. To reduce the number of failures to the cable insert on the line leaving the administrative and household complex (AHC), and to increase the reliability of power supply to consumers, it is advisable to divide the capacities of the existing 10 kV line into two parallel ones by laying a second line. It is recommended to install a current cut-off on the line outgoing to the AHC, the feasibility of the installation of which was shown by calculations. This will reduce the chance of failures to the cable gland. Data on the setting currents of overcurrent protection and current cut-off are given on the selectivity card.

How to cite: Klyuev R.V., Bosikov I.I., Gavrina O.A. Improving the efficiency of relay protection at a mining and processing plant // Journal of Mining Institute. 2021. Vol. 248 . p. 300-311. DOI: 10.31897/PMI.2021.2.14
Electromechanics and mechanical engineering
  • Date submitted
    2020-06-15
  • Date accepted
    2020-06-15
  • Date published
    2020-06-30

Multi-terminal dc grid overall control with modular multilevel converters

Article preview

This paper presents a control philosophy for multiterminal DC grids, which are embedded in the main AC grid. DC transmission lines maintain higher power flow at longer distances compared with AC lines. The voltage losses are also much lower. DC power transmission is good option for Russian north. Arctic seashore regions of Russia don't have well developed electrical infrastructure therefore power line lengths are significant there. Considering above it is possible to use DC grids for supply mining enterprises in Arctic regions (offshore drilling platforms for example). Three different control layers are presented in an hierarchical way: local, primary and secondary. This whole control strategy is verified in a scaled three-nodes DC grid. In one of these nodes, a modular multilevel converter (MMC) is implemented (five sub-modules per arm). A novel model-based optimization method to control AC and circulating currents is discussed. In the remaining nodes, three-level voltage source converters (VSC) are installed. For their local controllers, a new variant for classical PI controllers are used, which allow to adapt the values of the PI parameters with respect to the measured variables. Concerning the primary control, droop control technique has been chosen. Regarding secondary level, a new power flow technique is suggested. Unbalance conditions are also verified in order to show the robustness of the whole control strategy.

How to cite: Jiménez Carrizosa M., Stankovic N., Vannier J.-C., Shklyarskiy Y.E., Bardanov A.I. Multi-terminal dc grid overall control with modular multilevel converters // Journal of Mining Institute. 2020. Vol. 243 . p. 357-370. DOI: 10.31897/PMI.2020.3.357
Economical aspects in the developments оf fuel & energy complex
  • Date submitted
    2008-11-01
  • Date accepted
    2009-01-22
  • Date published
    2009-12-11

Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport

Article preview

Minimization of economic losses from downtime of equipment and, first of all, off-schedule (breakdowns, accidents) is an actual problem whose solution can be achieved by the development and creation of a reserve stocks (irreducible level) materials and spare parts of electrical equipment. As a result of the study and comparative analysis of different methods for determining the amount of the reserve stocks has been concluded that these approaches are not fully reflect the real needs of the enterprise. In this regard, has developed an optimal method for determining the amount of irreducible level of reserve stocks of electrical equipment, taking into account the rational order of delivery of equipment, spare parts.

How to cite: Vazhenina L.V. Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport // Journal of Mining Institute. 2009. Vol. 184 . p. 121-124.