Date submitted1971-07-29
-
Date accepted1971-09-15
-
Date published1972-05-26
Development of design theory and field development issues in the works of Prof. D. F. Borisov
- Authors:
- A. A. Borisov
- N. M. Proskuryakov
Mining engineer, Professor Dmitry F. Borisov for fourteen years, from 1954 to 1968 headed one of the leading departments of the Leningrad Mining Institute - the Department of Stratiform Deposit Development.
-
Date submitted1971-07-22
-
Date accepted1971-09-18
-
Date published1972-05-26
Methodology of calculation of loads on artificial pillars
- Authors:
- A. A. Borisov
- S. N. Suglobov
Room-and-pillar systems of development with cemented backfill are becoming more and more widespread. This causes the need for further development of calculation methods for determining the basic parameters of the systems and strength properties of the backfill. The purpose of such calculations is a reasonable choice of the width of inter-chamber pillars, chamber spans, width of a panel or block, dimensions of inter-block (panel) pillars, determination of the required strength of artificial pillars. The results of calculations, of course, will be different depending on the order of development of sections (blocks), chambers within one block, the structure and properties of the filling massif and other conditions.
-
Date submitted1971-07-22
-
Date accepted1971-09-13
-
Date published1972-05-26
Complex-mechanized development of thick steep seams with stowing
- Authors:
- E. Ya. Makhno
The problem of mining thick steep seams with backfilling has become especially acute in Kuzbass, where due to a number of technical circumstances it is required to significantly expand its use, while coal mining with backfilling is developing here very slowly. The unpopularity of backfilling in Kuzbass is explained, first of all, by the low efficiency of the mining systems used there. Thus, extraction of thick steep seams with backfilling is still carried out by the old systems, with slicing.
-
Date submitted1971-07-13
-
Date accepted1971-09-13
-
Date published1972-05-26
Sudden salt and gas releases
- Authors:
- N. M. Proskuryakov
Mining of potash seams is complicated by sudden salt and gas outbursts. Such outbursts are observed in the USSR during the mining of the Verkhnekamsk and Starobinsk potash deposits.
-
Date submitted1971-07-30
-
Date accepted1971-09-23
-
Date published1972-05-26
Calculation of pillars in underground dissolution of salt deposits
- Authors:
- V. S. Romanov
At domestic brine fields deposits of rock salt of various thickness (from 40 to 700 m) and depth (from 300 to 1400 m) are developed by solution mining, through boreholes. As a rule, cylindrical caverns of 100 m diameter are used. The caverns are arranged on a 200x200 m grid, and the width of inter-cavern pillars is 100 m. Such sizes of pillars are insufficiently justified due to limited experience of solution mining and lack of tested solutions. As a result, there is a danger of pillars destruction and surface subsidence.
-
Date submitted1971-07-20
-
Date accepted1971-09-17
-
Date published1972-05-26
Methodology and results of research of stable span sizes of brine chambers (for conditions of Yar-Bishkadak brine field)
- Authors:
- V. S. Romanov
At the Yar-Bishkadak field the rock salt deposit with the thickness of 200-700 m and the thickness of overburden of 500-600 m is developed by solution mining through boreholes from the surface. The development is carried out by individual vertical caverns, the diameter of which, according to the project, is equal to 100 meters. Due to untimely control of erosion results, there are deviations from the project, sometimes the diameters of the caverns reach 160-190 m, so it is not clear how much the actual outcrops of excavations meet the requirements of stability. The current absence of surface subsidence and large cavings in the caverns associated with the cessation of operation of boreholes is not yet a sufficient guarantee of the safety of further development, as the duration of operation of the caverns (3-15 years) is short compared to their total service life (50-80 years). As a result, there is a need to predict the stability of rocks and determine the maximum allowable spans of solution-mine workings.
-
Date submitted1971-07-08
-
Date accepted1971-09-16
-
Date published1972-05-26
Results of mine observations of rock pressure manifestations in conditions of a thin gently dipping seam Mine № 1/2 of the “Uglegorskugol” trust
Employees of the Leningrad Mining Institute together with workers of Mine No. 1/2 of the trust "Uglegorskugol" in 1967-1968 conducted at the mine observations of the manifestations of rock pressure at different methods of extraction and roof management. The purpose of the observations was to improve the technology of extraction of gently dipping Seam VI and to choose the most rational method of roof management. Seam VI is relatively uniform, the workable thickness is 0.95-1.10 m, the dip angle is 8-15° The roof of the seam is represented by layered claystones (0.4-0.6 m) and dense fine-grained sandstones (15-20 m). The floor of the seam is composed of claystones (0.1 m) and siltstones of medium strength, up to 8-10 m thick.
-
Date submitted1971-07-11
-
Date accepted1971-09-30
-
Date published1972-05-26
Regularities of rock pressure manifestations during mining of thick seams at the mines of “Sakhalinugol” combine by chamber-shield system
- Authors:
- V. G. Bezkaravainy
- M. A. Ruzhan
Through joint efforts of the staff of the Leningrad Mining Institute and the Sakhalinugol Combine, in 1967-1968 numerous mine and laboratory investigations were carried out, aimed at improving mining systems, face operation mechanization, and roof control for thick gently dipping seams.
-
Date submitted1971-07-01
-
Date accepted1971-09-08
-
Date published1972-05-26
Interaction of loose rocks with movable supports in steeply dipping seam mining
- Authors:
- G. I. Shvetsov
In the development of thin and medium-thickness steeply dipping seams using systems with long stopes along the dip, the most labor-intensive and arduous is supporting the face area, which takes up to 55-60% of working time.
-
Date submitted1971-07-01
-
Date accepted1971-09-12
-
Date published1972-05-26
Bulk rock pressure on the shield canopycanopy in the presence of non-parallel enclosing walls
- Authors:
- A. G. Vasiliev
Significant spread in both the coal and ore industries is gained by shield and flexible canopies, for the selection of rational and reliable designs of which it is necessary to know the loads acting on them.
-
Date submitted1971-07-30
-
Date accepted1971-09-07
-
Date published1972-05-26
Modeling of fractured rock mass collapse for the conditions of Khibiny apatite deposits
- Authors:
- N. Z. Galaev
- V. N. Krapivin
The methodology and results of laboratory studies of the process of caving of overlying rocks are outlined. The research was carried out in the Leningrad Mining Institute for conditions of mining the apatite deposits of the Khibiny, hanging wall of which is represented by hard fractured rocks.
-
Date submitted1971-07-28
-
Date accepted1971-09-26
-
Date published1972-05-26
Determination of the dimensions of the inelastic deformation zone around a supported opening subjected to abutment pressure
- Authors:
- A. G. Protosenya
The magnitude of rock falls, the load on mine support, and the displacement of their contours are determined mainly by the extent of the inelastic deformation zone formed in the rock mass surrounding the workings. In the practice of maintenance, the majority of development workings are affected by abutment pressure, and there are no calculation methods for assessing this effect on the size of the inelastic deformation zone.
-
Date submitted1971-07-19
-
Date accepted1971-09-17
-
Date published1972-05-26
On the possibility of reducing the solution of the doubly connected problem of mutual influence of two mine workings to a singly connected one
- Authors:
- A. G. Protosenya
In the practice of maintaining mine workings there are often cases of their mutual influence. Especially significant is the impact of extraction operations on the stress state in the vicinity of development openings. The solutions of these problems are complicated and cumbersome, and therefore they are mainly available for cases of mutual influence of openings of the same shape. Only some solutions for different shapes are known. However, these solutions due to the complexity of the final formulas have not become widely used to determine the stresses in the vicinity of openings. It is necessary to create simpler calculation methods.
-
Date submitted1971-07-11
-
Date accepted1971-09-08
-
Date published1972-05-26
Improvement of the method of measuring the rock pressure in models
- Authors:
- S. N. Suglobov
- V. L. Fedulin
- V. D. Yagodkin
When studying the manifestations of rock pressure on flat and three-dimensional models, various types of dynamometers are now widely used to create elastic measuring bases of stands.
-
Date submitted1971-07-27
-
Date accepted1971-09-20
-
Date published1972-05-26
On the change in the state of rocks in the abutment pressure zone
- Authors:
- V. B. Borovkov
- I. P. Weinrib
- E. A. Markina
Violation of the continuity of the rock mass, associated with the mining of deposits, is accompanied by a number of physical processes. Rocks in the zone of influence of mine workings are in a stress-strain state, which is a complex function of the structure of the mass and mining conditions of deposit development.
-
Date submitted1971-07-11
-
Date accepted1971-09-16
-
Date published1972-05-26
Fundamentals of the methodology of the for systematic control of roof lowering in mine subsidence in longwall faces
- Authors:
- M. A. Borisova
The steady increase in coal production and the transition to mining new deposits with increasingly complex conditions of occurrence makes the problems of monitoring rock pressure manifestations and predicting the behavior of the roof in mine workings a paramount task, which has not yet found its solution. This is due to a number of reasons, in particular, insufficient knowledge of rock pressure processes, and the lack of a methodology for systematic prediction based on monitoring measurements of the state of the rock mass.
-
Date submitted1971-07-03
-
Date accepted1971-09-19
-
Date published1972-05-26
Methods of experimental study of the stress state of rock masses and reinforced concrete support elements
- Authors:
- Yu. S. Obruchev
- G. G. Mirzaev
- G. A. Ashimov
At the Department of Construction of Mining Enterprises of LGI a method of stress measurement, instruments and equipment was developed, which is characterized by simplicity, reliability and sufficient accuracy. The method is based on the assumption that if a sensor is placed in a borehole in a rock mass, providing it with sufficiently good contact with the borehole walls, then as a result of displacement of the borehole walls under load, the sensor readings will change simultaneously. The forces acting on the sensor will decrease or increase depending on whether the rock mass is subjected to compressive or tensile stresses.
-
Date submitted1971-07-10
-
Date accepted1971-09-15
-
Date published1972-05-26
Investigation of physical and mechanical properties of salt rocks of Starobinsky deposit
Physical and mechanical properties of salt rocks were investigated in laboratory and underground conditions with respect to the problems of rock mechanics – calculation of rational parameters of room-and-pillar mining and identification of patterns of rock pressure manifestations. These tasks are of great importance in mining the Starobinsk potash deposit, represented by several potash seams, occurring at a depth of 420–640 m from the surface. At the deposit, two potash seams are mined with thicknesses of 1.8–4.0 m and 4.5–7.0 m, occurring respectively at depths of 420 and 580 m.
-
Date submitted1971-07-14
-
Date accepted1971-09-19
-
Date published1972-05-26
Use of gamma radiation for studying density properties of rock samples under hydrostatic compression conditions
- Authors:
- E. P. Popov
- V. I. Kimkov
Along with the development and improvement of traditional methods of pressure determination, based on the study of elastic strain values of rocks, various physical methods are increasingly used, including gamma methods of determining rock density.
-
Date submitted1971-07-07
-
Date accepted1971-09-20
-
Date published1972-05-26
On the detection of geologically complex areas by the radio-wave transmission method in stratiform deposit mining
- Authors:
- E. A. Markina
- O. V. Sergeev
In general, geologically complex areas of stratiform deposits represent zones of faults that differ slightly in electrical properties from the well-conducting surrounding rocks. To study faults located in a highly conductive medium and at considerable (up to 200 m) distances from the source of electromagnetic waves, relatively low frequencies are required, and it is often impossible to use conventional methods of interpreting the results of radio-wave transmission.