Calculation of pillars in underground dissolution of salt deposits
Authors:
Abstract
At domestic brine fields deposits of rock salt of various thickness (from 40 to 700 m) and depth (from 300 to 1400 m) are developed by solution mining, through boreholes. As a rule, cylindrical caverns of 100 m diameter are used. The caverns are arranged on a 200x200 m grid, and the width of inter-cavern pillars is 100 m. Such sizes of pillars are insufficiently justified due to limited experience of solution mining and lack of tested solutions. As a result, there is a danger of pillars destruction and surface subsidence.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Improvement of the method of measuring the rock pressure in models
1972 S. N. Suglobov, V. L. Fedulin, V. D. Yagodkin
On the change in the state of rocks in the abutment pressure
zone
1972 V. B. Borovkov, I. P. Weinrib, E. A. Markina
Fundamentals of the methodology of the for systematic control of roof lowering in mine subsidence in longwall faces
1972 M. A. Borisova
Use of gamma radiation for studying density properties of rock samples under hydrostatic compression conditions