Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 138

Similar articles

Calculation of parameters of wave processes at start-up of multi-drive belt conveyor
1993 M. M. Vetyukov, D. A. Jungmeister, V. A. Avdeev
Improvement of gear hydraulic machines by meshing geometry
1993 S. L. Ivanov, I. P. Ivanov, O. A. Krasnozhon
Existence area of spur gear meshing with a given overlap coefficient
1993 S. L. Ivanov
Small-sized unit for destruction of rocks of low strength
1993 A. A. Batalov, M. D. Kolomiytsov, Nguyen Khuu Lien
To the issue of studying the loading of resilient systems of dump trucks in the process of movement
1993 N. V. Zyryanov, V. Yu. Koptev
Statics and kinematics of vehicles with spiral-chain traction device on inclined track
1993 N. P. Boytsov, I. N. Boytsova