Submit an Article
Become a reviewer
Vol 138
Pages:
79-83
Download volume:
RUS
Article

Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 138

Similar articles

Automated calculation of optimal cutting modes during machining
1993 Yu. P. Boytsov
Calculation of parameters of wave processes at start-up of multi-drive belt conveyor
1993 M. M. Vetyukov, D. A. Jungmeister, V. A. Avdeev
Calculation of connections with guaranteed interference fit for a given probability of failure-free operation
1993 E. S. Kuznetsov
К вопросу о производительности щековой дробилки
1993 V. V. Denegin
Small-sized unit for destruction of rocks of low strength
1993 A. A. Batalov, M. D. Kolomiytsov, Nguyen Khuu Lien
Press for production of double-layer fuel coal briquettes
1993 Yu. D. Tarasov, V. V. Denegin, G. V. Sokolova, Yu. S. Fedorov, Yu. N. Marusov, N. K. Ulashchik