Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516

Authors:
A. A. Khalilov
Date submitted:
1992-09-25
Date accepted:
1992-11-29
Date published:
1993-12-28

Abstract

The technology of construction of single-wall stations of the St. Petersburg Metro provides for the development of the station core, which contains the bulk of the rock excavated during the construction of the station, after the construction of the upper vault. Until recently, this work was carried out mainly with the help of jackhammers.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 138

Similar articles

Press for production of double-layer fuel coal briquettes
1993 Yu. D. Tarasov, V. V. Denegin, G. V. Sokolova, Yu. S. Fedorov, Yu. N. Marusov, N. K. Ulashchik
Method of calculation of vector dimension chains
1993 A. P. Batalov
Improvement of gear hydraulic machines by meshing geometry
1993 S. L. Ivanov, I. P. Ivanov, O. A. Krasnozhon
Justification of design schemes of devices for mounting and dismantling works of mechanized complexes in mines of Pechora basin
1993 Yu. I. Rogov, D. A. Jungmeister
Calculation of connections with guaranteed interference fit for a given probability of failure-free operation
1993 E. S. Kuznetsov
Small-sized unit for destruction of rocks of low strength
1993 A. A. Batalov, M. D. Kolomiytsov, Nguyen Khuu Lien