Submit an Article
Become a reviewer
Vol 139
Pages:
16-19
Download volume:
RUS
Research article
Without section

Mathematical modeling of the operation of longwall faces at the mines of Vorkutaugol Production Association

Authors:
O. V. Kovalev
O. I. Kazanin
Date submitted:
1993-07-23
Date accepted:
1993-09-26
Date published:
1994-12-02

Abstract

Possible directions for solving the problem relevant to mining production, concerning the answers to the questions of expedient development of the front of cleaning works at mines are given. It is proposed to use the principles of regression analysis in the construction of mathematical models of this process, regression equations for the conditions of mine fields of the Vorkuta deposit are given. The possibility of using this principle in the selection of effective solutions for planning mining operations in the excavation of the remaining reserves of the field, taking into account the main mining and geological factors of development is noted.

Go to volume 139

Similar articles

Problems of development of geothermal resources in Russia
1994 E. I. Boguslavsky
Condensation humidification of coal dust aerosols and aerogels
1994 Yu. V. Shuvalov, V. N. Bobrovnikov, V. P. Belozerov, A. P. Veselov
The role of scientific and technological progress in the development of the mining industry
1994 V. A. Padukov
Application of radiation seismography to determine the contours of ejection-hazardous geological disturbances in the pillars of the Starobinskoye field prepared for mining
1994 O. V. Kovalev, S. S. Andreyko
Gas emissions in potash mines of the Starobinsky deposit
1994 I. I. Medvedev, A. N. Vedenin, V. V. Smirnyakov
At the origins of mining industry and science development in Russia
1994 A. A. Borisov