Improvement of methods for determining the upper boundary of water-conducting fracture zone
About authors
- 1 — Saint Petersburg Mining University
- 2 — Saint Petersburg Mining University
Abstract
The technique of definition of high bound of a zone of water-permeable cracks lowering costs of measurements of heads is adduced.