Submit an Article
Become a reviewer
Vol 146
Pages:
96-100
Download volume:
RUS
Article

Criterion for evaluating the qualifications of a surveyor

Authors:
V. V. Zverevich1
N. N. Babikova2
About authors
  • 1 — Saint Petersburg Mining University
  • 2 — Vorkuta Mining Institute
Date submitted:
2000-06-27
Date accepted:
2000-07-19
Date published:
2001-10-03

Abstract

Three distribution types of mine surveying works time are discussed and time criterion is suggested to estimate mine surveying labour.

Область исследования:
(Archived) Without section
Go to volume 146

Similar articles

Non-contact measurement of the site for construction
2001 Yu. N. Kornilov, V. V. Petrov
Determination of the positions of exposure of tectonic disturbances for prediction of shifts and deformations of the earth surface
2001 Yu. B. Fainshtein
Improvement of methods for determining the upper boundary of water-conducting fracture zone
2001 V. N. Gusev, N. G. Nikiforova
Solid body modeling in mine surveying
2001 V. A. Golovanov, A. I. Naumenko
Automation of the processes of determination of the location of objects from a single photograph
2001 A. N. Grin, R. M. Khrushch, V. P. Duda
A new method for calculation of the stability of high dumps of sandstone-clay rocks
2001 A. M. Mochalov