Experimental studies on ice cutting
About authors
- 1 — St. Petersburg State Mining Institute
- 2 — St. Petersburg State Mining Institute
Abstract
In order to drill "dry" wells in snow-firn and ice strata, the SPbSMI (TU) Department of Drilling Technology and Technology is developing a technology of mechanical drilling with bottom-hole air circulation to remove cuttings. The electromechanical drilling tool for drilling with bottom-hole air blowout is similar to the previously developed KEMS-112* drilling tool for drilling deep wells filled with filling fluid.
Область исследования:
(Archived) Without section
Similar articles
Expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, N. I. Bukhanova
Quality of rock blasting as the basis of profitability of a crushed stone plant
2001 Yu. I. Vinogradov, A. G. Zatonskikh
Specifics of drilling flowing wells in intervals of unstable formations
2001 N. I. Nikolaev, E. Yu. Tsygelnyuk, N. S. Konokotov, N. A. Shatov