Experimental studies on ice cutting
About authors
- 1 — St. Petersburg State Mining Institute
- 2 — St. Petersburg State Mining Institute
Abstract
In order to drill "dry" wells in snow-firn and ice strata, the SPbSMI (TU) Department of Drilling Technology and Technology is developing a technology of mechanical drilling with bottom-hole air circulation to remove cuttings. The electromechanical drilling tool for drilling with bottom-hole air blowout is similar to the previously developed KEMS-112* drilling tool for drilling deep wells filled with filling fluid.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
The degree of impact of crushing quality on the energy intensity of technological processes in the production of crushed stone
2001 A. I. Arsentev, O. N. Talamanova
Theoretical basis of an express method of explosive fracture assessment based on seismic signal parameters
2001 S. V. Lukichev