Submit an Article
Become a reviewer
Vol 148 Iss. 2
Pages:
41-44
Download volume:
RUS
Article

Combined technology for ore-bed breaking with concentrated and beam charges

Authors:
A. A. Eremenko1
I. V. Mashukov2
G. P. Ermak3
S. V. Fefelov4
About authors
  • 1 — Institute of Mining Engineering, SD RAS
  • 2 — OAO VOSTNIGRI
  • 3 — ABAKAN OAO ZMSK
  • 4 — ABAKAN OAO ZMSK
Date submitted:
2000-07-28
Date accepted:
2000-08-21
Date published:
2001-12-21

Abstract

At Siberian mines tests were conducted and commercial development of combined technology of rock mass stripping with the use of vertical concentrated charges (VKZ) and beam borehole charges began.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Specifics of drilling flowing wells in intervals of unstable formations
2001 N. I. Nikolaev, E. Yu. Tsygelnyuk, N. S. Konokotov, N. A. Shatov
Damping plate parts test of the moving cover
2001 E. B. Shevkun, N. A. Leonenko
Issues in mechanical ice drilling
2001 I. G. Shelkovnikov
Calculation of the main parameters of drilling and blasting operations in the explosion of selective detonating explosive charges
2001 ZH. G. Dambaev, A. V. Zditovetskii, V. N. Kovalevskii
Model of the granulometric composition of the fractured mined rock at the edge
2001 M. G. Menzhulin, G. P. Paramonov, S. V. Khokhlov
Development of technical means to improve the safety of blasting operations in mines, hazardous in gas and dust
2001 Yu. V. Gorlov