Combined technology for ore-bed breaking with concentrated and beam charges

Authors:
A. A. Eremenko1
I. V. Mashukov2
G. P. Ermak3
S. V. Fefelov4
About authors
  • 1 — Institute of Mining Engineering, SD RAS
  • 2 — OAO VOSTNIGRI
  • 3 — ABAKAN OAO ZMSK
  • 4 — ABAKAN OAO ZMSK
Date submitted:
2000-07-28
Date accepted:
2000-08-21
Date published:
2001-12-21

Abstract

At Siberian mines tests were conducted and commercial development of combined technology of rock mass stripping with the use of vertical concentrated charges (VKZ) and beam borehole charges began.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Principle of database construction for the expert system of seismic safety of blasting operations
2001 V. A. Belin, D. K. Potresov, A. D. Lvov
Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia
2001 I. V. Mashukov, A. N. Topkaev, G. V. Goltsov, V. N. Nikitin, Yu. M. Karapetyan, V. K. Dzhalov, P. A. Filippov
Technology of explosive demolition of an industrial high-rise building with a metal bearing frame
2001 P. A. Filippov, A. P. Gaidin, I. V. Mashukov, L. M. Tsinker
Theoretical fundamentals of ice drilling using a relief slot
2001 A. M. Shkurko
Determination of strength and abrasiveness of rocks by the spectrum of acoustic noise during drilling and cutting
2001 A. G. Arkhipov
Intensity based on seismic scale, vibration velocity and distance reduction in blasting
2001 V. Kh. Pergament, Yu. E. Ovcharov, E. V. Goncharov