Combined technology for ore-bed breaking with concentrated and beam charges

Authors:
A. A. Eremenko1
I. V. Mashukov2
G. P. Ermak3
S. V. Fefelov4
About authors
  • 1 — Institute of Mining Engineering, SD RAS
  • 2 — OAO VOSTNIGRI
  • 3 — ABAKAN OAO ZMSK
  • 4 — ABAKAN OAO ZMSK
Date submitted:
2000-07-28
Date accepted:
2000-08-21
Date published:
2001-12-21

Abstract

At Siberian mines tests were conducted and commercial development of combined technology of rock mass stripping with the use of vertical concentrated charges (VKZ) and beam borehole charges began.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Thermal regime of ice breaking in rotary drilling
2001 P. G. Talalai
Specifics of drilling flowing wells in intervals of unstable formations
2001 N. I. Nikolaev, E. Yu. Tsygelnyuk, N. S. Konokotov, N. A. Shatov
Technology of explosive demolition of an industrial high-rise building with a metal bearing frame
2001 P. A. Filippov, A. P. Gaidin, I. V. Mashukov, L. M. Tsinker
Environmental issues in building materials extraction
2001 Yu. V. Shuvalov, A. L. Gubenko, A. P. Bulbashev
Issues of fracture research in drilling explosive boreholes
2001 R. I. Sukhov, Yu. M. Lebedkin, A. V. Tymchur
Problems of environmental safety monitoring at blasting sites
2001 N. N. Aleinikov, N. N. Vershinin, K. K. Shvedov