Experimental studies on ice cutting
About authors
- 1 — St. Petersburg State Mining Institute
- 2 — St. Petersburg State Mining Institute
Abstract
In order to drill "dry" wells in snow-firn and ice strata, the SPbSMI (TU) Department of Drilling Technology and Technology is developing a technology of mechanical drilling with bottom-hole air circulation to remove cuttings. The electromechanical drilling tool for drilling with bottom-hole air blowout is similar to the previously developed KEMS-112* drilling tool for drilling deep wells filled with filling fluid.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Technology of explosive demolition of an industrial high-rise building with a metal bearing frame
2001 P. A. Filippov, A. P. Gaidin, I. V. Mashukov, L. M. Tsinker
Scientific and practical issues of core preservation technology developed by VITR
2001 V. A. Kaulin, P. P. Ponomarev
Quality of rock blasting as the basis of profitability of a crushed stone plant
2001 Yu. I. Vinogradov, A. G. Zatonskikh
Mixed charge devices for emulsion explosives
2001 N. K. Shalygin, V. P. Glinskii, B. V. Matseevich, P. P. Markov