Submit an Article
Become a reviewer
Vol 148 Iss. 2
Pages:
44-50
Download volume:
RUS
Article

Development of rational constructions of vertical concentrated explosive charges for mass destruction of ore

Authors:
A. A. Eremenko1
I. V. Mashukov2
S. F. Fefelov3
About authors
  • 1 — Institute of Mining Engineering SB RAS
  • 2 — OAO VOSTNIGRI
  • 3 — OAO Zapsibcombinat
Date submitted:
2000-07-25
Date accepted:
2000-08-24
Date published:
2001-12-21

Abstract

In the practice of blasting in the mining industry during mining of minerals by underground mining for crushing the rock mass, borehole charges of explosives, as well as borehole and stone (mine) charges located in the chambers, tunnels and mine wells are used. The largest volume of rock mass removal is currently carried out by borehole explosive charges. Mines in Gornaya Shoria, Khakassia and the Urals use the technology of stripping by bundles of parallel-conjugated borehole charges.

Область исследования:
(Archived) Without section
Go to volume 148

Similar articles

Improvement of blasting operations at quarries in the south of Kuzbass
2001 I. V. Timoshin, A. V. Zykov
Intensity based on seismic scale, vibration velocity and distance reduction in blasting
2001 V. Kh. Pergament, Yu. E. Ovcharov, E. V. Goncharov
Investigation of fracture processes of composites with hybrid spatially reinforced weighting material
2001 G. E. Freger, V. P. Tatsienko, V. M. Buchatskii
Improvement of safety of blasting operations at pyrite mines
2001 G. P. Paramonov
Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia
2001 I. V. Mashukov, A. N. Topkaev, G. V. Goltsov, V. N. Nikitin, Yu. M. Karapetyan, V. K. Dzhalov, P. A. Filippov
The degree of impact of crushing quality on the energy intensity of technological processes in the production of crushed stone
2001 A. I. Arsentev, O. N. Talamanova