Submit an Article
Become a reviewer
Vol 148 No 2
Pages:
97-98
Download volume:
Research article
Without section

Technology of explosive demolition of an industrial high-rise building with a metal bearing frame

Authors:
P. A. Filippov1
A. P. Gaidin2
I. V. Mashukov3
L. M. Tsinker4
About authors
  • 1 — OAO Sheregeshskoye RU
  • 2 — OAO Sheregeshskoye RU
  • 3 — OAO VOSTNIGRI
  • 4 — OAO VOSTNIGRI
Date submitted:
2000-07-13
Date accepted:
2000-08-01
Date published:
2001-02-01

Abstract

At many enterprises, depreciation and amortization of buildings and structures significantly exceeds the standard terms. After the commissioning of new facilities, the old ones are closed, their repair and maintenance are stopped. Buildings fall into an emergency condition with spontaneous collapse of walls and elements of building structures with the possible accidental presence of people in the danger zone. Responsibility for the occurrence and consequences of a hazardous situation is borne by the company in charge of the facility. In order to eliminate the hazardous situation, it is necessary to carry out measures to eliminate the emergency facilities.

Go to volume 148

Similar articles

Issues in mechanical ice drilling
2001 I. G. Shelkovnikov
Damping plate parts test of the moving cover
2001 E. B. Shevkun, N. A. Leonenko
Quality of rock blasting as the basis of profitability of a crushed stone plant
2001 Yu. I. Vinogradov, A. G. Zatonskikh
Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
2001 G. G. Karkashadze, N. O. Taran
Industrial explosives on bases of reconstituted (conversion) explosives
2001 N. K. Shalygin, B. V. Matseevich, V. P. Glinskii, O. F. Mardasov
Thermal regime of ice breaking in rotary drilling
2001 P. G. Talalai