Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia
Authors:
About authors
- 1 — OOO VOSTNIGRI
- 2 — OOO VOSTNIGRI
- 3 — OAO Kuznetsk Metallurgical Plant
- 4 — OAO Kuznetsk Metallurgical Plant
- 5 — OAO Kuznetsk Metallurgical Plant
- 6 — Kazsky mine Temirtau
- 7 — OAO Sheregesh Mining Department
Abstract
Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Development of technical means to improve the safety of blasting operations in mines, hazardous in gas and dust
2001 Yu. V. Gorlov
Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
2001 G. G. Karkashadze, N. O. Taran
Calculation of rational parameters of fracture of frozen soils during the construction of excavations of given dimensions
2001 I. I. Drozd
Combined technology for ore-bed breaking with concentrated and beam charges
2001 A. A. Eremenko, I. V. Mashukov, G. P. Ermak, S. V. Fefelov