Submit an Article
Become a reviewer
Vol 148 Iss. 2
Pages:
68-71
Download volume:
RUS
Article

Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia

Authors:
I. V. Mashukov1
A. N. Topkaev2
G. V. Goltsov3
V. N. Nikitin4
Yu. M. Karapetyan5
V. K. Dzhalov6
P. A. Filippov7
About authors
  • 1 — OOO VOSTNIGRI
  • 2 — OOO VOSTNIGRI
  • 3 — OAO Kuznetsk Metallurgical Plant
  • 4 — OAO Kuznetsk Metallurgical Plant
  • 5 — OAO Kuznetsk Metallurgical Plant
  • 6 — Kazsky mine Temirtau
  • 7 — OAO Sheregesh Mining Department
Date submitted:
2000-07-08
Date accepted:
2000-08-03
Date published:
2001-12-21

Abstract

Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Issues of fracture research in drilling explosive boreholes
2001 R. I. Sukhov, Yu. M. Lebedkin, A. V. Tymchur
Industrial explosives on bases of reconstituted (conversion) explosives
2001 N. K. Shalygin, B. V. Matseevich, V. P. Glinskii, O. F. Mardasov
Intensity based on seismic scale, vibration velocity and distance reduction in blasting
2001 V. Kh. Pergament, Yu. E. Ovcharov, E. V. Goncharov
Thermal regime of ice breaking in rotary drilling
2001 P. G. Talalai
Mixed charge devices for emulsion explosives
2001 N. K. Shalygin, V. P. Glinskii, B. V. Matseevich, P. P. Markov
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov