Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia

Authors:
I. V. Mashukov1
A. N. Topkaev2
G. V. Goltsov3
V. N. Nikitin4
Yu. M. Karapetyan5
V. K. Dzhalov6
P. A. Filippov7
About authors
  • 1 — OOO VOSTNIGRI
  • 2 — OOO VOSTNIGRI
  • 3 — OAO Kuznetsk Metallurgical Plant
  • 4 — OAO Kuznetsk Metallurgical Plant
  • 5 — OAO Kuznetsk Metallurgical Plant
  • 6 — Kazsky mine Temirtau
  • 7 — OAO Sheregesh Mining Department
Date submitted:
2000-07-08
Date accepted:
2000-08-03
Date published:
2001-02-01

Abstract

Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.

Go to volume 148

Similar articles

Expert method of reducing uncertainty in seismic safety calculations of blasting operations
2001 V. A. Belin, D. K. Potresov, N. I. Bukhanova
Influence of explosion energy on the quality of rough diamonds
2001 A. T. Vedin, V. Ya. Konovalenko
Calculation of the main parameters of drilling and blasting operations in the explosion of selective detonating explosive charges
2001 ZH. G. Dambaev, A. V. Zditovetskii, V. N. Kovalevskii
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov
Improvement of safety of blasting operations at pyrite mines
2001 G. P. Paramonov
Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
2001 G. G. Karkashadze, N. O. Taran