Submit an Article
Become a reviewer
Vol 148 Iss. 2
Pages:
68-71
Download volume:
RUS
Article

Directions for the development of comprehensive mechanization of blasting operations in the mines of Mountain Shoriya and Khakassia

Authors:
I. V. Mashukov1
A. N. Topkaev2
G. V. Goltsov3
V. N. Nikitin4
Yu. M. Karapetyan5
V. K. Dzhalov6
P. A. Filippov7
About authors
  • 1 — OOO VOSTNIGRI
  • 2 — OOO VOSTNIGRI
  • 3 — OAO Kuznetsk Metallurgical Plant
  • 4 — OAO Kuznetsk Metallurgical Plant
  • 5 — OAO Kuznetsk Metallurgical Plant
  • 6 — Kazsky mine Temirtau
  • 7 — OAO Sheregesh Mining Department
Date submitted:
2000-07-08
Date accepted:
2000-08-03
Date published:
2001-02-01

Abstract

Mechanization of blasting operations at underground mines in Gornaya Shoria and Khakassia began in the 1970s using granulated explosives and pneumatic charging equipment. Mines tested charging machines UZS-1500, UZS-6000, UZDM-1, 3MB, ZMBS-1 and ZMBS-2 developed by NIPIGormash company.

Область исследования:
(Archived) Without section
Go to volume 148

Similar articles

Electro-pulse method of rock fracturing and drilling wells
2001 D. V. Zhgun, V. F. Vazhov, M. Yu. Zhurkov
Development of sealing and lubrication systems for bearings of high-speed roller bits
2001 Yu. G. Matveev, A. N. Popov, R. A. Ismakov, O. G. Blinkov, A. I. Moguchev, Yu. I. Samokhodov
Improvement of blasting operations at quarries in the south of Kuzbass
2001 I. V. Timoshin, A. V. Zykov
Development of technical means to improve the safety of blasting operations in mines, hazardous in gas and dust
2001 Yu. V. Gorlov
Calculation of rational parameters of fracture of frozen soils during the construction of excavations of given dimensions
2001 I. I. Drozd
Intensity based on seismic scale, vibration velocity and distance reduction in blasting
2001 V. Kh. Pergament, Yu. E. Ovcharov, E. V. Goncharov