Submit an Article
Become a reviewer
Vol 148 No 2
Pages:
41-44
Download volume:
Research article
Without section

Combined technology for ore-bed breaking with concentrated and beam charges

Authors:
A. A. Eremenko1
I. V. Mashukov2
G. P. Ermak3
S. V. Fefelov4
About authors
  • 1 — Institute of Mining Engineering, SD RAS
  • 2 — OAO VOSTNIGRI
  • 3 — ABAKAN OAO ZMSK
  • 4 — ABAKAN OAO ZMSK
Date submitted:
2000-07-28
Date accepted:
2000-08-21
Date published:
2001-02-01

Abstract

At Siberian mines tests were conducted and commercial development of combined technology of rock mass stripping with the use of vertical concentrated charges (VKZ) and beam borehole charges began.

Go to volume 148

Similar articles

Calculation of the main parameters of drilling and blasting operations in the explosion of selective detonating explosive charges
2001 ZH. G. Dambaev, A. V. Zditovetskii, V. N. Kovalevskii
The degree of impact of crushing quality on the energy intensity of technological processes in the production of crushed stone
2001 A. I. Arsentev, O. N. Talamanova
Issues of fracture research in drilling explosive boreholes
2001 R. I. Sukhov, Yu. M. Lebedkin, A. V. Tymchur
Energy balance of rock fracture and contact problems of exploratory drilling
2001 L. K. Gorshkov, B. G. Tarasov, N. I. Nikolaev
Experimental studies on ice cutting
2001 N. I. Vasilev, V. M. Zubkov
Investigation of fracture processes of composites with hybrid spatially reinforced weighting material
2001 G. E. Freger, V. P. Tatsienko, V. M. Buchatskii