Combined technology for ore-bed breaking with concentrated and beam charges

Authors:
A. A. Eremenko1
I. V. Mashukov2
G. P. Ermak3
S. V. Fefelov4
About authors
  • 1 — Institute of Mining Engineering, SD RAS
  • 2 — OAO VOSTNIGRI
  • 3 — ABAKAN OAO ZMSK
  • 4 — ABAKAN OAO ZMSK
Date submitted:
2000-07-28
Date accepted:
2000-08-21
Date published:
2001-12-21

Abstract

At Siberian mines tests were conducted and commercial development of combined technology of rock mass stripping with the use of vertical concentrated charges (VKZ) and beam borehole charges began.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

The degree of impact of crushing quality on the energy intensity of technological processes in the production of crushed stone
2001 A. I. Arsentev, O. N. Talamanova
Perspectives for intensification of operation of mining pits on the basis of environmental safety requirements
2001 A. S. Derzhavets, V. I. Romanov, O. I. Khokhlov
Calculation of the main parameters of drilling and blasting operations in the explosion of selective detonating explosive charges
2001 ZH. G. Dambaev, A. V. Zditovetskii, V. N. Kovalevskii
Influence of explosion energy on the quality of rough diamonds
2001 A. T. Vedin, V. Ya. Konovalenko
Development of sealing and lubrication systems for bearings of high-speed roller bits
2001 Yu. G. Matveev, A. N. Popov, R. A. Ismakov, O. G. Blinkov, A. I. Moguchev, Yu. I. Samokhodov
Development of water-towering way of breaking wells in drilling and blasting operations at mining open pits
2001 G. G. Karkashadze, N. O. Taran