Submit an Article
Become a reviewer
Vol 150 No 2
Pages:
41-44
Download volume:
RUS

Comprehensive solution to the gas content of mined-out space of Vorkuta coal mines and hard-to-cut roof landings

Authors:
M. M. Popov
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2001-07-25
Date accepted:
2001-08-26
Date published:
2002-05-20

Abstract

The problem of managing methane emission in the mined-out space of the mines of the Vorkuta coal deposit is considered. The mining-geological and mining-technical conditions affecting the current gas situation are briefly described. The main problems usually arise at a distance of 100-200 m from the mine workings.The main method used to control gas-air flows - the erection of a chug wall. The disadvantages of this method are revealed, which lie in the possible creation of a situation, when the ventilation scheme “direct flow with sublight” turns into a “return” one. Two new ways of solving the problem of the emergence of local concentrations of methane, carried out by air leaks from the worked-out space to the ventilation mine are proposed. The first way is based on the use of foam strips, the second - in the additional laying of strips of filling material. The second method also involves solving the problem of hard-to-crack roof landings. A method of calculating the optimal volume of stowing material for the proposed method, taking into account the necessary undermining of the “Triple” formation, is proposed.

Go to volume 150

Similar articles

Pelletizing of chrome raw materials
2002 S. A. Urnysheva
Comparative assessment of iodine determination techniques in natural waters
2002 A. A. Evstratova
Architecture and profiles of an analytical information system
2002 V. A. Khachaturyan
Influence of thickness of Proterozoic clays in the tunnel roof on shifts of clay-sediment contact
2002 E. E. Martirosyants
The implementation of the main functions of journalism in the publicist texts of Karl Kraus
2002 Yu. M. Sishchuk
Ore quality management in mining planning
2002 O. V. Erikh