Optimization of the system of drainage and burial of drainage brines of the Mir pipe deposit

Authors:
F. G. Atroshchenko1
K. A. Soloveichik2
About authors
  • 1 — St. Petersburg Branch, Institute of Geoecology RAS
  • 2 — St. Petersburg Branch, Institute of Geoecology RAS
Date submitted:
2002-06-29
Date accepted:
2002-07-19
Date published:
2003-03-20

Abstract

The analysis of dewatering system operation during transition to underground development of the Mir kimberlite pipe is given. Numerical geofiltration model of the field area is developed, which is used to compare different scenarios of dewatering system operation. Forecasts of brine inflows to the drainage system and changes in levels in the Meteoro-Ichersky aquifer complex for the period up to 2020 are given. Recommendations on drainage system optimization taking into account drainage brines burial are developed.

Область исследования:
(Archived) Modern problems of geotechnical and hydrogeological surveys
Funding:

None

Go to volume 153

Similar articles

The cartographic model of engineering-geological environment of Professor V.D. Lomtadze and practical aspects of its implementation in Lithuania
2003 R. B. Mikshis, V. Ignatavichyus, V. Martsinkyavichyus
Challenges of engineering and geological research of the territory of Irkutsk
2003 I. I. Verkhozin, A. V. Samusenko, S. P. Nikiforov
On the causes of oil contamination of the Ordovician horizon on the Izhora Plateau
2003 V. Yu. Abramov, M. S. Iskhakov, K. A. Soloveichik, I. L. Kharkhordin
Zonal peculiarities of groundwater flow formation in the Urals
2003 Yu. M. Nesterenko, N. V. Solomatin
Engineering and geological characterization of the Mesozoic weathering crust
2003 E. N. Skvaletskii
Engineering petrology of metasomatites
2003 O. N. Gryaznov