Optimization of the system of drainage and burial of drainage brines of the Mir pipe deposit

Authors:
F. G. Atroshchenko1
K. A. Soloveichik2
About authors
  • 1 — St. Petersburg Branch, Institute of Geoecology RAS
  • 2 — St. Petersburg Branch, Institute of Geoecology RAS
Date submitted:
2002-06-29
Date accepted:
2002-07-19
Date published:
2003-01-01

Abstract

The analysis of dewatering system operation during transition to underground development of the Mir kimberlite pipe is given. Numerical geofiltration model of the field area is developed, which is used to compare different scenarios of dewatering system operation. Forecasts of brine inflows to the drainage system and changes in levels in the Meteoro-Ichersky aquifer complex for the period up to 2020 are given. Recommendations on drainage system optimization taking into account drainage brines burial are developed.

Go to volume 153

Similar articles

Assessment of the probability of involvement in the development of mineral reserves with different levels of availability
2003 K. N. Trubetskoi, A. A. Peshkov, N. A. Matsko
A new approach in the development of engineering-geological typing of mineral deposits
2003 I. P. Ivanov, T. N. Nikolaeva
Monitoring of hydrogeomechanical processes in the emergency section of the St. Petersburg subway
2003 Yu. A. Norvatov, I. B. Petrova, V. V. Nazima, I. V. Rusanov
Geoecological challenges of the Russian brine fields
2003 A. G. Kononova, A. I. Levchenko
Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
2003 E. Yu. Nesynova, A. I. Yudkevich
The use of isotope methods in the study of groundwater balance (Almeria, Spain)
2003 I. L. Kharkhordin, I. V. Tokarev