Optimization of the system of drainage and burial of drainage brines of the Mir pipe deposit

Authors:
F. G. Atroshchenko1
K. A. Soloveichik2
About authors
  • 1 — St. Petersburg Branch, Institute of Geoecology RAS
  • 2 — St. Petersburg Branch, Institute of Geoecology RAS
Date submitted:
2002-06-29
Date accepted:
2002-07-19
Date published:
2003-03-20

Abstract

The analysis of dewatering system operation during transition to underground development of the Mir kimberlite pipe is given. Numerical geofiltration model of the field area is developed, which is used to compare different scenarios of dewatering system operation. Forecasts of brine inflows to the drainage system and changes in levels in the Meteoro-Ichersky aquifer complex for the period up to 2020 are given. Recommendations on drainage system optimization taking into account drainage brines burial are developed.

Go to volume 153

Similar articles

Current state and problems of development of engineering geology
2003 V. A. Korolev
Using the method of engineering-geological analogies to assess the properties of soils in engineering structures
2003 E. V. Melnik
Rationale for the necessity of hydrogeoecological monitoring at the Leningrad oil shale deposit
2003 N. S. Petrov, M. N. Kutyaikina, Yu. A. Norvatov, I. B. Petrova
Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
2003 E. Yu. Nesynova, A. I. Yudkevich
Employment opportunities in St. Petersburg for young professionals in the field of engineering geology
2003 M. O. Zueva
Regularities of soil moisture changes in the Southern Urals
2003 E. N. Skvaletskii, O. A. Golubnichaya