Optimization of the system of drainage and burial of drainage brines of the Mir pipe deposit

Authors:
F. G. Atroshchenko1
K. A. Soloveichik2
About authors
  • 1 — St. Petersburg Branch, Institute of Geoecology RAS
  • 2 — St. Petersburg Branch, Institute of Geoecology RAS
Date submitted:
2002-06-29
Date accepted:
2002-07-19
Date published:
2003-03-20

Abstract

The analysis of dewatering system operation during transition to underground development of the Mir kimberlite pipe is given. Numerical geofiltration model of the field area is developed, which is used to compare different scenarios of dewatering system operation. Forecasts of brine inflows to the drainage system and changes in levels in the Meteoro-Ichersky aquifer complex for the period up to 2020 are given. Recommendations on drainage system optimization taking into account drainage brines burial are developed.

Go to volume 153

Similar articles

Employment opportunities in St. Petersburg for young professionals in the field of engineering geology
2003 M. O. Zueva
Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
2003 E. Yu. Nesynova, A. I. Yudkevich
Prevention of dynamic destruction of solid rock layers in the soil of preparatory workings
2003 M. G. Mustafin
Engineering petrology of metasomatites
2003 O. N. Gryaznov
The cartographic model of engineering-geological environment of Professor V.D. Lomtadze and practical aspects of its implementation in Lithuania
2003 R. B. Mikshis, V. Ignatavichyus, V. Martsinkyavichyus
On the causes of oil contamination of the Ordovician horizon on the Izhora Plateau
2003 V. Yu. Abramov, M. S. Iskhakov, K. A. Soloveichik, I. L. Kharkhordin