Optimization of the system of drainage and burial of drainage brines of the Mir pipe deposit

Authors:
F. G. Atroshchenko1
K. A. Soloveichik2
About authors
  • 1 — St. Petersburg Branch, Institute of Geoecology RAS
  • 2 — St. Petersburg Branch, Institute of Geoecology RAS
Date submitted:
2002-06-29
Date accepted:
2002-07-19
Date published:
2003-01-01

Abstract

The analysis of dewatering system operation during transition to underground development of the Mir kimberlite pipe is given. Numerical geofiltration model of the field area is developed, which is used to compare different scenarios of dewatering system operation. Forecasts of brine inflows to the drainage system and changes in levels in the Meteoro-Ichersky aquifer complex for the period up to 2020 are given. Recommendations on drainage system optimization taking into account drainage brines burial are developed.

Go to volume 153

Similar articles

V.D. Lomtadze - creator of a series of fundamental textbooks on engineering and geological disciplines
2003 V. T. Trofimov
Current state and problems of geotechnical surveys for hydraulic engineering
2003 V. O. Istochnikov, S. V. Kriventsov
Employment opportunities in St. Petersburg for young professionals in the field of engineering geology
2003 M. O. Zueva
On the classification of natural and man-made geological processes and phenomena in the light of V.D. Lomtadze's teachings
2003 O. V. Kutsnashvili, D. V. Chkheidze, E. D. Tsereteli
Information support for permanent mathematical models
2003 D. L. Ustyugov, Nur Abdirizak
The cartographic model of engineering-geological environment of Professor V.D. Lomtadze and practical aspects of its implementation in Lithuania
2003 R. B. Mikshis, V. Ignatavichyus, V. Martsinkyavichyus