Submit an Article
Become a reviewer
Vol 155 No 2
Pages:
113-115
Download volume:
RUS
Research article
Mining electromechanics

Theoretical analysis of water supply means of high-pressure self-propelled hydromonitors

Authors:
V. Yu. Mizurev
About authors
  • G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2002-07-14
Date accepted:
2002-08-26
Date published:
2003-12-30

Abstract

At hydroshafts, all hydromonitors are rigidly connected to the supply steel pipe, which does not ensure achieving the optimal distance from the nozzle to the bottom hole chest during the whole time of hydrodrilling. We consider a technical solution for making self-propelled hydraulic motors moveable during hydrodrilling. The most acceptable variants are the feeding-energy-conducting packet based on "Nurenberg shears" and the daisy-chain telescopic energy-conducting packet (TPP). Parameters of the new TPP and operational and technical performance of self-propelled hydromonitors with this device at cleaning are obtained. The increase in the productivity of hydrowinning can be 25-30 %, which should be considered as significant.

Go to volume 155

References

  1. Германская Г.В. и др. О возможности использования лазерного дальномера для обеспечения обратной связи между грудью забоя и гидромонитором // Труды ВНИИГидроугля, 1979, вып. 43.
  2. Емельянов Ф.К. и др. Результаты приемочных испытаний самоходного гидромонитора с дистанционно изменяемой программой 12ГП-2 // Труды ВНИИГидроугля, 1977, вып. 39.
  3. Медведков В.И, Выбор и обоснование параметров средств подвода воды к гидромониторам / В.И.Медведков, В.Ю.Мизурёв // Горные машины и автоматика. 2003, № 7.
  4. Охрименко В.А. и др. Подземная гидродобыча угля. М.: Недра, 1966.
  5. Цяпко Н.Ф. Гидроотбойка угля на подземных работах / Н.Ф.Цяпко, А.М.Чапка М.: Госгортехнадзор, I960.

Similar articles

Development of a device for combustion of fuel oil and gas mixture
2003 V. V. Kanenkov
Improving the quality of wellbore cementing by applying the technology of vibrating the entire length of the production string during the initial period of waiting for cement curing
2003 L. I. Garipova, R. A. Usmanov
Theoretical justification of the effective type of turbo-motor for the drive of hydraulic motors
2003 A. L. Bukin
Expansion of filter zones of hydrogeological and water wells
2003 K. S. Goidenko
Management of rheological properties of the washing fluid by targeted treatment with reagents of the polyacrylate group
2003 D. A. Dernov
Determination of rational parameters of drainage excavations in the emission hazardous zones of potassium formations
2003 E. R. Kovalskii