Geology

Improving the quality of wellbore cementing by applying the technology of vibrating the entire length of the production string during the initial period of waiting for cement curing

Authors:
L. I. Garipova1
R. A. Usmanov2
About authors
  • 1 — Almetyevsk Oil Institute
  • 2 — Almetyevsk Oil Institute
Date submitted:
2002-07-29
Date accepted:
2002-08-06
Date published:
2003-12-30

Abstract

The results of introduction in practice of the complex technology of well completion and well casing, developed in the Oktyabrsky branch of VNII GIS, aimed at quality casing in wells and increase of well service life, are evaluated. Briefly considered the stages of implementation of the technology in wells, presents materials of geophysical studies on basic and experimental wells, the results of technological efficiency of work. Conclusions are set out to assess the quality and technical and economic indicators of well cementing. When cementing casing strings, improvement of formation separation quality is observed. The probability of behind-the-casing flows decreases and the period of corrosion resistance of the casing increases. The necessity of further application of this technology as well as work on modernization of technical samples technology is noted.

Область исследования:
Geology
Funding:

None

Go to volume 155

Similar articles

Increasing the efficiency of tax regulation in the sphere of subsoil use
2003 S. A. Filatov
Use of conversion explosives in quarries in the Northwest region
2003 S. Yu. Semenyak
Material composition and formation conditions of Sarmatian deposits of the Stavropol arch
2003 A. V. Korkoshko
Improvement of the circular heating furnace design scheme by reducing heat losses through the closed loop heating zone
2003 P. S. Chesnokov
Environmentally friendly technologies for disintegrating clay sands in the development of gold and platinum deposits
2003 A. V. Karepanov
Analysis of the results of application of enhanced oil recovery technologies and the choice of bottomhole zone treatment method for reservoir D1 of the Miadsey field based on well 47
2003 A. G. Ruzhnikov