Submit an Article
Become a reviewer
Vol 156
Pages:
183-185
Download volume:
Research article
Surveying and geodesy

Sonars for measuring the depth of blast wells

Authors:
V. A. Golovanov
About authors
  • G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2003-06-12
Date accepted:
2003-07-25
Date published:
2004-01-01

Abstract

The issues of creating echolocation devices for measuring the depth of blast wells are considered. Control of the depth of the drilled wells is important to improve the reliability of information about the chipped massif. This helps to reduce mineral loss and improve crushing of the blasted massif. The first samples of sonars of this type were created at the Leningrad Mining Institute. Subsequently, according to the same scheme devices were developed at other enterprises. Dependences between borehole diameter and pulse frequency are given, as well as the results of studies of sonar resolving ability.

Go to volume 156

References

  1. А.с. 1059160 СССР. Звуколокационный скважинный глубиномер / А.И.Алексеев, В.Б.Аранович, П.М.Кузнецов, Л.Н.Руднев / Опубл. 07.12.83. Бюл. № 45.
  2. А.с. 918913 СССР. Устройство для эхолокационного контроля скважин / И.А.Прудов, В.А.Голованов, О.В.Ширинский / Опубл. 07.04.82. Бюл. № 3.
  3. Аранович В.Б. Маркшейдерский контроль взрывных скважин методом эхолокации / В.Б.Аранович, Л.Н.Руднев // Маркшейдерское дело в социалистических странах / ВНИМИ. Л., 1979. Вып.8.
  4. Коваленко А.И. К вопросу о точности разбуривания рудных массивов при системах разработки с отбойкой руды веерами скважинных зарядов // Горный журнал. 1976. № 9.
  5. Руднев Л.Н. Состояние и эффективность применения акустического метода измерения глубины взрывных скважин / Л.Н.Руднев, В.К.Чумак // Маркшейдерское дело и геодезия. Новые результаты в области автоматизации, методики и обработки маркшейдерско-геодезических измерений. Сб. научных статей / Ленинградский горный ин-т. Л., 1988.

Similar articles

Recommendations for investment feasibility studies in the design of geothermal power plants
2004 E. I. Boguslavskii
Problems of calculation of mine workings and underground structures lining
2004 N. S. Bulychev
Determining the area of a plot using the coordinates of additional points of its sides
2004 M. Ya. Bryn, A. V. Astapovich, A. I. Kondratev
On the influence of the construction technology of St. Petersburg metro stations on the process of shifting the earth's surface
2004 M. V. Dolgikh, E. M. Volokhov
Use of GIS-technologies for zoning the territory of Frunzensky District of St. Petersburg
2004 V. A. Kiselev, E. V. Semeoshenkova
The issues of geomechanical justification of effective mining of reserves in mine fields
2004 O. V. Kovalev, Yu. G. Sirenko, I. Yu. Tkhorikov, S. L. Blokhin