Experience of using the SDL30 electronic level during tests of the Trinity Bridge
About authors
- 1 — St. Petersburg State Transport University
- 2 — St. Petersburg State Transport University
- 3 — St. Petersburg State Transport University
Abstract
The experience of using SDL30 electronic level during tests of the Trinity Bridge in St. Petersburg conducted in May 2003 is described. The deflections of spans were determined by the results of high-precision geometric leveling. The characteristics of the level used and some test results are given. The use of electronic levels significantly reduced the time of leveling and perform a large amount of work by one team of surveyors. It is proposed to use the electronic level, which allows to speed up significantly the measurement process and get rid of the routine work of processing the results.
Область исследования:
(Archived) Surveying and geodesy
Funding:
None
Similar articles
Research of regularities of geotechnological and qualimetric indicators of coals of the Tkibulskoe deposit
2004 A. N. Sheremet
Influence of the construction protective coating on the stress and strain state of the ore rock massif
2004 D. A. Potemkin
Geodetic breaking-down net for the bridge crossing of Kama river
2004 V. V. Gruzinov, V. A. Kougiya, O. N. Malkovskii, V. D. Petrov, V. I. Poletaev, V. V. Sukhanov
Determination of the rational length of horizontal transport excavations of underground structures
2004 V. N. Makishin, Yu. A. Zudikhin