Submit an Article
Become a reviewer
Vol 156
Pages:
123-126
Download volume:
RUS

Calculation of the parameters of artificial pillars in the ascending order of deposit mining

Authors:
D. Yu. Minaev1
E. I. Boguslavskii2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining University
  • 2 — G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2003-06-08
Date accepted:
2003-07-26
Date published:
2004-09-09

Abstract

The stress state of artificial monolithic pillars under the combined system of field development, which is affected by the rock pressure of hanging wall rocks and the active pressure of loose rock filling located in the chamber of the 2nd stage, was analyzed. As a result of calculations the optimum length of of the 1st stage chamber is 8 m, length of the 2nd stage II chamber is 40 m, hardening deposit strength is 3 MPa.

Go to volume 156

References

  1. Борщ-Компониец В.И. Горное давление при отработке мощных пологих рудных залежей / В.И.Борщ-Компониец, А.Б.Макаров. М.: Недра, 1986.
  2. Казикаев Д.М. Совместная разработка рудных месторождений. М.: Недра, 1967.
  3. Прокофьев П.П. Давление сыпучего тела и расчет подпорных стенок. М.: Недра, 1947.
  4. Цыганов М.Н. Разработка месторождений полезных ископаемых с монолитной закладкой / М.Н.Цыганов, П.Э.Зурков. М.: Недра, 1970.

Similar articles

On the problem of environmental zoning of urban areas based on geographic information systems
2004 M. A. Nevskaya, V. A. Kiselev, E. I. Dompalm
Manifestation of rock pressure in the capital and preparatory workings in the saline rocks of the Internatsionalny mine
2004 S. A. Konstantinova, A. S. Kulminskii, M. K. Sorochenko
Calculation of thermal stresses in the ground mass around the chamber, where the temperature is maintained by radioactive decay
2004 A. G. Protosenya, A. K. Chernikov, G. N. Zhurov
Improving the efficiency of construction of conjunctions of capital mine workings through the use of anchoring
2004 E. V. Kiteleva, V. V. Pershin
Improvement of the system of taxation of settlement lands
2004 L. N. Smirnova, V. A. Pavlova
Principle scheme for obtaining displacements and deformations of layers of the undermined strata with an undetermined mineral extraction line
2004 V. N. Gusev, V. N. Monakhov, V. V. Guryanov