Calculation of the parameters of artificial pillars in the ascending order of deposit mining

Authors:
D. Yu. Minaev1
E. I. Boguslavskii2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining University
  • 2 — G.V. Plekhanov Saint Petersburg Mining University
Date submitted:
2003-06-08
Date accepted:
2003-07-26
Date published:
2004-09-09

Abstract

The stress state of artificial monolithic pillars under the combined system of field development, which is affected by the rock pressure of hanging wall rocks and the active pressure of loose rock filling located in the chamber of the 2nd stage, was analyzed. As a result of calculations the optimum length of of the 1st stage chamber is 8 m, length of the 2nd stage II chamber is 40 m, hardening deposit strength is 3 MPa.

Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Go to volume 156

Similar articles

The issues of geomechanical justification of effective mining of reserves in mine fields
2004 O. V. Kovalev, Yu. G. Sirenko, I. Yu. Tkhorikov, S. L. Blokhin
Consideration of the effect of humidity on the volumetric density of coal in the calculation of its reserves
2004 R. A. Takranov
Equalization of free spatial networks
2004 S. V. Tyurin
Parameter development of polymeric steel tie bolt of the field workings at the mine SUBR
2004 E. I. Mikulin, R. G. Minzaripov
Assessment of compliance of mining and backfill operations design parameters at Verkhnekamsk potash mines with mining and geological conditions from the perspective of geodynamic safety of the subsurface and the earth's surface
2004 S. A. Konstantinova, S. A. Chernopazov, V. E. Marakov
Consideration of environmental and economic consequences of mechanized logging when compiling the land cadaster
2004 V. F. Kovyazin