Forecasting technique of tunnel exploitation stability of St. Petersburg underground
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining University
- 2 — St. Petersburg Metropoliten
Abstract
In-situ measurements of tunnels deformation for Saint-Petersburg subway are given. Time dependable wave character of tunnels deformation in the form of rising and lowering was discovered. It was established that periodical rising and lowering of tunnels occur along the track section with disrupted rock mass and tectonic fissure. It was suggested that tunnel stability prediction technique is based on rate of it displacement.
Similar articles
Determination of plumb line deviation components using space navigation system consumer equipment
2004 A. I. Yakovlev
Optimization of costs of a mining company in the context of operational management
2004 N. A. Reinik
Geodetic breaking-down net for the bridge crossing of Kama river
2004 V. V. Gruzinov, V. A. Kougiya, O. N. Malkovskii, V. D. Petrov, V. I. Poletaev, V. V. Sukhanov