Submit an Article
Become a reviewer
Vol 159 Iss. 2
Pages:
126-128
Download volume:
RUS
Article

Main areas of improvement of the alumina production model for plants operating according to the Bayer method

Authors:
D. A. Savelev
About authors
  • Moscow State Institute of Steel and Alloys
Date submitted:
2003-07-24
Date accepted:
2003-08-20
Date published:
2004-12-27

Abstract

The model of alumina production created earlier at the Moscow Institute of Steel and Alloys according to Bayer method for conditions of the Nikolaev alumina refinery is evaluated. The model makes it possible to quickly assess the work of the whole alumina production and to choose the option that provides the best economic performance. The tasks for further improvement of the program associated with the optimization of the main stages of alumina production - leaching and decomposition are considered.

Область исследования:
Metallurgy
Go to volume 159

Similar articles

Development of alluvial deposits by means of small-scale mechanization
2004 D. S. Opryshko
Development of engineering methods for the protection of shallow waters and flooded areas
2004 M. V. Prokhorenko
Geodetic work for installation and alignment of large-size equipment
2004 Abdali Zhalal Akhmad
Selection and justification of acid compositions for bottomhole zone cleaning
2004 I. Kh. Mingalimov
Influence of economic indicators on the efficiency of regulation of oil field development by horizontal wells
2004 D. P. Patrakov
Technique for evaluating the tightness of hydraulic props of mechanized roof supports
2004 K. G. Buyalich