Increase of continuity of power supply systems at territorially dispersed loads
- Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The article deals with the methodology of improving the reliability of power supply systems in conditions of geographically dispersed loads. The relevance of this issue is explained by the significant damage to mining enterprises due to power supply failures. The proposed methodology is based on the determination of the optimal number of electrical substations at mining enterprises and the connection of collector bus bars of different substations with the help of automatic operation of the reserve. The optimum number of electrical substations is determined using the method of potential functions. This method allows dividing consumers into groups and determining the center of electrical load in each group. Connection of different collector buses of substations increases the reliability of the power supply system of the enterprise as a whole. Calculation of reliability parameters for two variants of the power supply system, as well as their comparative analysis is carried out.
References
- Абрамович Б.Н. Надежность систем электроснабжения / Б.Н.Абрамович, В.В.Полищук. Санкт-Петербургский горный ин-т. СПб, 1997.
- Айзерман М.А. Метод потенциальных функций в теории обучения машин / М.А.Айзерман, Э.М.Браверман, Л.И.Розоноэр. М.: Наука, 1970.
- Надежность систем электроснабжения / В.В.Зорин, В.В.Тисленко, Ф.Клеппель, Г.Адлер. Киев: Вища школа, 1984.
- Федоров А.А. Основы электроснабжения промышленных предприятий: Учебник для вузов / А.А.Федоров, В.В.Каменева. М.: Энергоатомиздат, 1984.
- Шабад М.А. Автоматизация распределительных электрических сетей с использованием цифровых реле: Учеб. пособие. СПб: ПЭИпк, 2000.