Experimental research stand for studying downhole processes of ARPD deposition
Authors:
About authors
- Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The article substantiates the necessity of creating a bench for studying the process of AGPD (asphalt-hummin-paraffin deposition) by simulating bottomhole space. The article presents the scheme of the stand operation for well research, and also summarizes the existing problems in the operation of oil wells with high content of asphalt-hummin-paraffin deposits. Methods of prevention and elimination of deposits are considered, explaining the importance of development of a test bench for investigation of downhole space. The main elements of the test bench are described.
Similar articles
Justification of the methodology of determination of optimal normative payments and optimal strategies of the enterprise on environmental protection
2006 N. V. Gurova
Monitoring of soil and vegetation cover in the zone of impact of OAO Boksitogorsky Alumina
2006 D. S. Korelskii
Justification of requirements to ecological safety of diesel engines of transport machines for underground conditions
2006 K. A. Strebkov