To calculation of parameters of drilling and anchoring installation

Authors:
V. I. Medvedkov1
S. S. Dranov2
V. P. Shebin3
About authors
  • 1 — Professor G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
  • 3 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-07-01
Date accepted:
2006-09-19
Date published:
2007-03-02

Abstract

Drilling and boring units, which include a hydraulic motor and anchoring mechanism, are used to attach the cutting machine. The schemes of water supply of the machine tool are analyzed and a rational variant is selected. The disadvantages of the known water motors are disclosed and the ways of their improvement are suggested. Recommendations on calculation of the parameters of the hydraulic motor, on the design of the anchoring mechanism and its calculation are developed. The result on the efficiency of light cutting machine with a new way of fixing its time is obtained.

Область исследования:
(Archived) Mining electromechanics
Go to volume 170

Similar articles

The role of geology in the formation of scientific worldview
2007 B. Ya. Pukshanskiy, G. B. Pospekhov
Modern state of mineral raw material base and prospects of development of geological exploration works in oil industry
2007 E. A. Solovieva, N. A. Pavlova
Selection and calculation of autogenous and semi-autogenous grinding mills
2007 N. V. Nikoleva
Synthesis of aluminum alloys alloyed with rare and transition metals
2007 U. A. Aimatov
Management of borrowed capital formation (on the example of JSC MNPO Polymetal)
2007 N. M. Ovchinnikova
History of lithogenesis of Lower Permian shikhans
2007 A. Z. Kagarmanova