Submit an Article
Become a reviewer
Vol 170 No 2
Pages:
110-112
Download volume:
RUS

Geomechanical justification of tunnel parameters in construction of subway in Perm

Authors:
V. V. Musikhin
About authors
  • Perm State Technical University
Date submitted:
2006-08-07
Date accepted:
2006-10-07
Date published:
2007-04-11

Abstract

The project of underground electric transportation scheme for Perm city is considered. Geomechanical calculations of the proposed scheme have been performed to determine the stress-strain state around the unsupported circular opening in elastic approximation using geoinformation technologies. The calculation of the lining is performed using the method developed by B.A. Kartozia and V.N. Borisov. In conclusion, the methodology of obstruction and calculated geometric parameters of the mine support are given.

Мусихин В.В. Геомеханическое обоснование параметров тоннеля при строительстве метрополитена в Перми // Записки Горного института. 2007. Т. № 2 170. С. 110-112.
Musikhin V.V. Geomechanical justification of tunnel parameters in construction of subway in Perm // Journal of Mining Institute. 2007. Vol. № 2 170. p. 110-112.
Go to volume 170

References

  1. Булычев Н.С. Механика подземных сооружений. М.: Недра, 1982.
  2. Картозия Б.А. Инженерные задачи механики подземных сооружений / Б.А.Картозия, В.Н.Борисов. М.:Изд-во МГУ, 2001.
  3. Мнацаканов В.А. Метротрамвай – скоростной городской транспорт XXI века // Подземное пространство мира / Метрострой. СПб, 2001.
  4. Физико-механические свойства горных пород, горное давление и методы проходки горных выработок при строительстве метрополитена в г.Перми / Пермский политехнический ин-т. Пермь, 1982.

Similar articles

Nitrification of high ammonia concentrations in membrane bioreactors - microbiological aspect
2007 Anna Raszka, Joanna Surmacz-Górska
Experimental research concerning the influence of external diameter on the behavior of coiled tubing to cyclic bending with internal pressure
2007 Vlad Ulmanu, Dragos Zisopol, Ciprian Trifan
Features of operation of electric centrifugal pump units when forcing liquid withdrawal from wells of Samotlor oil field
2007 A. V. Kolonskikh
Position of HR department in the company of the 21 century
2007 Marta Znojek
Specific support actions which improve researcher’s mobility as examples of projects carrying out at the Silesian University of Technology in Gliwice, Poland
2007 Maria Galuszko
New Design and functional solutions of equipment for well drilling and oil production
2007 Storozh Ion Andrei, Kalote Nikolaie