Abstract
The project of underground electric transportation scheme for Perm city is considered. Geomechanical calculations of the proposed scheme have been performed to determine the stress-strain state around the unsupported circular opening in elastic approximation using geoinformation technologies. The calculation of the lining is performed using the method developed by B.A. Kartozia and V.N. Borisov. In conclusion, the methodology of obstruction and calculated geometric parameters of the mine support are given.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Similar articles
Technical and technological support of well wiring according to the set profile at Shershnevskaya area
2007 S. E. Chernyshov
Production aspects of ductility minimum emperature dmt phenomenon in as cast CuNi25 alloy
2007 R. Nowosielski, P. Sakiewicz, M. Lutyński
Application of magnetic method in the geological research of facial differentiation of the Upper Jurassic limestones in Krakow-Wielun Upland, Southern Poland
2007 Joanna Jędrys