Submit an Article
Become a reviewer
Vol 170 Iss. 2
Pages:
67-70
Download volume:
RUS
Article

Hydrodynamic modeling of joint operation of well and reservoir under conditions of geological and technical intervention (TI)

Authors:
N. S. Lenchenkov
About authors
  • Ufa State Petroleum Technical University
Date submitted:
2006-08-10
Date accepted:
2006-10-06
Date published:
2007-04-11

Abstract

Optimization of production wells operation is an important problem in field development. Currently there are various methods of solving this problem. Of practical importance are studies of the reservoir-well system as a complex hydrodynamic system. It is known that change of formation characteristics (for example, productivity index, relative permeability) leads to change of well characteristics. In this connection it seems reasonable to carry out geological and technical treatment (acid microemulsion) of bottom-hole formation zone as a way to optimize well performance. In the work, models of joint behavior of the reservoir-well system are investigated in order to optimize the operation of producing wells. The models were tested at the Sergeevskoye field of the UGPD Ufaneft, well No. 49.

Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Funding:

None

Go to volume 170

Similar articles

Efficiency of application of heap leaching technology at OAO Pokrovskiy Rudnik
2007 K. Yu. Sergunova
Problems of the protection of mining terrains in the mining industry of zinc and lead ores
2007 Monika Piskorz
Three-product heavy-medium separator
2007 V. E. Tolkachev
Run in hole and cementing of reinforced concrete columns in large diameter holes
2007 Gabriela Stan
Crystal chemistry of synthetic pyromorphite-mimetite solid solutions
2007 Marta Strycharczyk
Occupational health and safety management rules according to pier-merit program in polish coal mines
2007 Alicja Krzemień, Aleksandra Dyszy