Submit an Article
Become a reviewer
Vol 170 No 2
Pages:
187-193
Download volume:
RUS

Project financing structures for the russian natural resources sector

Authors:
Thomas Schumann
About authors
  • Bergakademie Freiberg
Date submitted:
2006-08-21
Date accepted:
2006-10-11
Date published:
2007-04-11

Abstract

The study examines how the lack of investment in the natural resource sector can be overcome through the application of project finance structures, which have not yet been used in Russia. The main characteristics of project finance are reviewed, its opportunities compared to traditional corporate finance are emphasized, the most common obstacles hindering the implementation of project finance schemes are considered, and the necessary steps to improve the situation are outlined.

Go to volume 170

References

  1. Bema Gold Corporation (2000): IFC Signs Mandate Letter for Julietta Project Financing, http://www.bema.com/ 337/57/news.htm [access: April 4, 2006].
  2. Claudy, P. (2002): Projektfinanzierung in Emerging Markets – eine institutionenökonomische Analyse, Sternenfels (Wissenschaft & Praxis).
  3. EBRD (1997): Sakhalin II (Phase 1) Oil Project – Project Summary Document, http://www.ebrd.com/projects/psd/ psd1997/3321.htm [access: April 4, 2006].
  4. EBRD (2001a): Natural Resources – April 2001, London (EBRD).
  5. EBRD (2001b): Transition Report 2001 – Energy in Transition, London (EBRD).
  6. EBRD (2002): SeverTEK – Project Summary Document, http://ebrd.org/projects/psd/psd2002/19677.htm [access: April 4, 2006].
  7. EBRD (2004): Middle-Timan Bauxit Mining & Processing Project – Project Summary Document, http://www. ebrd.com/projects/psd/psd2004/20318.htm [access: April 4, 2006].
  8. EBRD (2005a): Sakhalin II (Phase 2) Oil Project – Environmental Impact Assessment, http://www.ebrd.com/ projects/eias/russia/5897.htm [access: April 4, 2006].
  9. EBRD (2005b): Transition Report 2005 – Business in Transition, London (EBRD).
  10. EBRD (2005c): Trans Siberian Gold – Environmental Impact Assessment, http://www.ebrd.com/projects/eias/ russia/35364.htm [access: April 4, 2006].
  11. EBRD (2006a): EBRD and IFC welcome commitment to high governance and business standards by RUSAL Chairman Oleg Deripaska (press release), http://www. ebrd.com/new/pressrel/2006/2jan17.htm [access: April 4, 2006].
  12. EBRD (2006b): Syndications showcase, http://ebrd. org/oppor/syndi/showcase/index.htm [access: April 4, 2006].
  13. Linden, E. von der (2002): Finanzierung von Bergwerken und Bergbauausrüstungen, in: Glückauf, No. 138, p. 227-232.
  14. Nevitt, P. K. / Fabozzi, F. (2000): Project Financing, 7th edition, London (Euromoney).
  15. The Banker (2004): Russia’s Project Finance Challenge, Special Supplement October 2004.
  16. Trans-Siberian Gold (2006): TSG to go ahead with Asacha – work ongoing at Veduga, http://www. londonstockexchange.com/LSECWS/IFSPages/MarketNewsPopup. aspx?id=1164752&source=RNS [access: April 10, 2006].
  17. WWF (2004): Position Paper on Sakhalin II Oil & Gas Development, http://assets.panda.org/downloads/ wwfpositionpapersakhalin.pdf [access: April 4, 2006].
  18. Yescombe, E. R. (2002): Principles of Project Finance, Amsterdam et al. (Academic Press).

Similar articles

Feasibility study of CO2 storage in closed coal mines
2007 Marcin A. Lutyński, Piotr Sakiewicz
Run in hole and cementing of reinforced concrete columns in large diameter holes
2007 Gabriela Stan
A new method of investigation of blasting effects on buildings and structures using fiberglass cables
2007 K. Drebenstedt, S. Pessler
Environmental condition of natural waters in the territory of the City of Tomsk
2007 E. Yu. Pasechnik
Bathymetric measurements for the installation of the tsunami early warning system in the Indian Ocean
2007 Christoph Warmbrunn, Andreas Thoss
The directions of development as a chance for small family farms
2007 Małgorzata Mielczarek