Problems of seismic safety provision during transportation tunnel construction
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — G.V. Plekhanov Saint Petersburg Mining Institute
- 4 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The problems of seismic impact of explosion on a tunnel are characterized. A methodology for determining the parameters in Sadovsky's formula for seismic wave displacement velocities based on the results of measurements at one point of the velocity time histories of seismic oscillations from subsequent short-term delayed explosions is proposed. The correlation between the parameters is established. The influence of errors in the determination of parameters on the calculation of seismically safe mass of the explosive charge is estimated.
References
- Богацкий В.Ф. Прогноз и ограничение сейсмической опасности промышленных взрывов // Взрывное дело. 1983. № 85/42. С.201-213.
- Гоноровский И.С. Радиотехнические цепи и сигналы. М.: Радио и связь, 1986. 512 с.
- Мосинец В.Н. Дробящее и сейсмическое действие взрыва в горных породах. М.: Недра, 1976. 271 с.
- Шуйфер М.И. Исследование сейсмического эффекта взрыва на строительство гидросооружений // Взрывное дело. 1983. № 85/42. С.132-137.
Similar articles
Technology of rational fracture of differing strength rocks
2007 G. V. Sekisov, S. D. Viktorov, Yu. N. Reznik, A. V. Rashnik, A. S. Zelberg
Management of rock pressure and gas emission in the excavated space during the development of coal seams at great depths
2007 A. V. Montikov
Modeling of rock massive fracture in the process of moving of a cleaning face with different speed
2007 M. G. Mustafin
New ways and methods of dispersing complex-structured massifs of ferruginous quartzites at explosive ore preparation
2007 V. A. Belin, V. N. Anisimov