Problems of seismic safety provision during transportation tunnel construction
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — G.V. Plekhanov Saint Petersburg Mining Institute
- 4 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The problems of seismic impact of explosion on a tunnel are characterized. A methodology for determining the parameters in Sadovsky's formula for seismic wave displacement velocities based on the results of measurements at one point of the velocity time histories of seismic oscillations from subsequent short-term delayed explosions is proposed. The correlation between the parameters is established. The influence of errors in the determination of parameters on the calculation of seismically safe mass of the explosive charge is estimated.
References
- Богацкий В.Ф. Прогноз и ограничение сейсмической опасности промышленных взрывов // Взрывное дело. 1983. № 85/42. С.201-213.
- Гоноровский И.С. Радиотехнические цепи и сигналы. М.: Радио и связь, 1986. 512 с.
- Мосинец В.Н. Дробящее и сейсмическое действие взрыва в горных породах. М.: Недра, 1976. 271 с.
- Шуйфер М.И. Исследование сейсмического эффекта взрыва на строительство гидросооружений // Взрывное дело. 1983. № 85/42. С.132-137.
Similar articles
Results of measurements of detonation velocity of low shock-wave sensitive explosives in borehole charges
2007 V. G. Dodukh, A. A. Dobrynin, I. A. Dobrynin
Cavity to the beginning of detonation products release into the atmosphere
2007 N. N. Kazakov, A. V. Shlyapin