Submit an Article
Become a reviewer
Vol 171
Pages:
229-232
Download volume:
RUS
Article

Problems of seismic safety provision during transportation tunnel construction

Authors:
A. N. Kholodilov1
S. G. Gendler2
E. Yu. Vinogradova3
A. S. Shilyaev4
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 3 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 4 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-09-06
Date accepted:
2006-11-23
Date published:
2007-09-11

Abstract

The problems of seismic impact of explosion on a tunnel are characterized. A methodology for determining the parameters in Sadovsky's formula for seismic wave displacement velocities based on the results of measurements at one point of the velocity time histories of seismic oscillations from subsequent short-term delayed explosions is proposed. The correlation between the parameters is established. The influence of errors in the determination of parameters on the calculation of seismically safe mass of the explosive charge is estimated.

Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Go to volume 171

Similar articles

Peculiarities of action of charges with axial cavity in wells
2007 A. E. Frantov
Models of rock slumping on ledges at different blasting techniques
2007 B. R. Rakishev
Energy efficiency of rock destruction during explosion of explosives with different detonation characteristics
2007 M. G. Menzhulin, V. E. Brovin
Experimental study of the influence of rock fracture filler properties on their dynamic deformation
2007 I. V. Belinskii, V. V. Grzhibovskii, V. A. Lemeshko
About the cumulative effect in rock destruction by deconcentrated charges
2007 Yu. P. Galchenko
About large scale ore stripping at open pits
2007 S. D. Viktorov, N. N. Kazakov