Problems of seismic safety provision during transportation tunnel construction
About authors
- 1 — G.V. Plekhanov Saint Petersburg Mining Institute
- 2 — G.V. Plekhanov Saint Petersburg Mining Institute
- 3 — G.V. Plekhanov Saint Petersburg Mining Institute
- 4 — G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The problems of seismic impact of explosion on a tunnel are characterized. A methodology for determining the parameters in Sadovsky's formula for seismic wave displacement velocities based on the results of measurements at one point of the velocity time histories of seismic oscillations from subsequent short-term delayed explosions is proposed. The correlation between the parameters is established. The influence of errors in the determination of parameters on the calculation of seismically safe mass of the explosive charge is estimated.
Область исследования:
(Archived) Blasting, explosives and means of mechanization of their application
Similar articles
Results of measurements of detonation velocity of low shock-wave sensitive explosives in borehole charges
2007 V. G. Dodukh, A. A. Dobrynin, I. A. Dobrynin
Ways to increase the time of blast action on the massif
2007 E. B. Shevkun, A. V. Leshchinskii, N. K. Lukashevich
BCJ series mixing and charging machine for emulsion explosives with sensitization in boreholes
2007 Van Syui-Guan, Syun Daiyui, Gun Bin, Li Gochzhun, Shi Venlyan, Zhen Bin
Seismic impact of explosion on engineering structures and rock massive
2007 M. K. Egizbaev, V. L. Vykhodtsev, V. A. Artemov, E. Yu. Vinogradova, S. V. Shcherbich