Submit an Article
Become a reviewer
Vol 173
Pages:
217-220
Download volume:
RUS

Application of the boundary element method for calculating the parameters of the stress-strain state of a rock massif in the vicinity of workings of different outline

Authors:
A. P. Gospodarikov1
L. A. Bespalov2
About authors
  • 1 — Professor G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — Research assistant G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-11-13
Date accepted:
2007-01-02
Date published:
2007-12-29

Abstract

The natural stress-strain state of mining massif is disrupted while mining works is carried on. Different numerical methods can be applied for calculation of parameters stress and strain state in the mining massif: the finite difference method, the finite-element method, the boundary element method, the application of the last of these methods is described in this work. The problem of distribution strains around entries of different configuration, drifted in elastic, homogeneous, isotropic mining massif is described. The indirect method of fictitious stresses and the boundary integral method are used for solution this problem.

Go to volume 173

References

  1. Бенерджи П. Методы граничных элементов в прикладных науках / П.Бенерджи, Р.Баттерфилд. М.: Мир, 1984.
  2. Крауч С. Методы граничных элементов в механике твердого тела / С.Крауч, А.Старфилд. М.: Мир, 1987.

Similar articles

Modeling of steady-state operation mode of air-pipe section
2007 M. A. Trotsko
Methodology of oil search in the Earth crust
2007 N. S. Lenchenkov
Influence of electric drive control systems on self-synchronization of unbalance vibrators
2007 S. Yu. Tyagushev
Development of technologies for killing and stimulation of oil wells during underground workover
2007 M. K. Rogachev, D. V. Mardashov, K. V. Strizhnev
Reinforcement of foundations and bases of buildings and structures by drill injection wells for St. Petersburg conditions
2007 A. I. Korovin
Analysis and assessment of groundwater breakthroughs possibility during the zero cycle construction works within the Baltic Pearl multifunctional complex
2007 A. M. Zhukova