Submit an Article
Become a reviewer
Vol 173
Pages:
139-140
Download volume:
Research article
Metallurgy

Mathematical modeling of open cycle of grinding in rod mill

Authors:
N. V. Nikolaeva
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2006-11-05
Date accepted:
2007-01-16
Date published:
2007-05-01

Abstract

Modeling of ore treatment processes allows selecting those options that contribute to cost and risk reduction. The use of universal forecasting software packages, such as JKSimMet, greatly facilitates and accelerates the calculation processes associated with the analysis of ore treatment schemes, saves not only time, but also money, giving the opportunity to consider many options with the subsequent selection of the most effective. In some cases, computer modeling is the only way to obtain reliable results.

Go to volume 173

Similar articles

Methodical aspects of evaluation of the role of geomechanical conditions of coal-bearing massifs in formation of safe conditions of mining of high-gas-bearing coal seams of the Pechora basin
2007 O. V. Kovalev, S. A. Vasiliev, I. Yu. Thorikov, K. A. Bondarev
Modeling of steady-state operation mode of air-pipe section
2007 M. A. Trotsko
Some questions of development, application and production of germanium
2007 A. A. Chistyakov, I. T. Zhadovskiy
Methodology of oil search in the Earth crust
2007 N. S. Lenchenkov
Influence of electric drive control systems on self-synchronization of unbalance vibrators
2007 S. Yu. Tyagushev
Economic evaluation of hydrocarbon fields of Sakhalin Island shelf
2007 D. M. Metkin